My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC RES 96-045 RESOLUTION RECEIVING REPORT AND ORDERING PLANS AND SPECIFICATIONS
StAnthony
>
City Council
>
City Council Resolutions
>
1996
>
CC RES 96-045 RESOLUTION RECEIVING REPORT AND ORDERING PLANS AND SPECIFICATIONS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 2:50:14 PM
Creation date
4/19/2016 2:50:12 PM
Metadata
Fields
SP Box #
26
SP Folder Name
RES 1996
SP Name
CC RES 96-045 RESOLUTION RECEIVING REPORT AND ORDERING PLANS AND SPECIFICATIONS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
July 1, 1996 <br /> • Mr. Larry Hamer <br /> Public Works Director <br /> City of St. Anthony <br /> 3301 Silver Lake Road <br /> St. Anthony, MN 55418 <br /> RE: Street Project Cost Analysis <br /> Dear Mr. Hamer: <br /> Per your request, we have analyzed the construction costs for recent street projects in the <br /> City of St. Anthony. Actual construction costs for the 1994 and 1995 projects in St. Anthony <br /> were $443,000 and $643,000, respectively. These costs translate to $143.40 and $160.75 per <br /> linear foot of constructed street, respectively. The increase in lineal foot cost for the 1995 <br /> project can be attributed mainly to the fact that a substantial quantity of storm sewer was <br /> included. <br /> For reference purposes, we also analyzed a number of similar projects in other communities, <br /> to show more clearly how costs have changed over time. In performing our cost analysis, we <br /> Ic III evaluated 7 major construction items: <br /> rieke <br /> carroll 1. Common Excavation <br /> muller <br /> fates, inc. 2. Class 5 Aggregate Base <br /> 3. Bituminous Base Course <br /> Wi7neers sury 4. Bituminous Wear Course <br /> ects <br /> land surveyors <br /> 5. B618 Curb and Gutter <br /> equal opportunity 6. 6" Dip Watermain <br /> employer 7. 12" RCP Storm Sewer <br /> The following table shows unit prices for these 7 items over the past 8 years. <br /> Year of Construction <br /> Item Unit 1988 1989 1990 1991 1992 1993 1994 1995 <br /> Common CY 3.95 0.50 1.20 4.00 4.00 1.90 4.00 4.80 <br /> years Excavation <br /> Class 5 Aggregate Ton 5.15 8.00 8.00 7.00 7.50 6.00 6.80 7.45 <br /> helping Base <br /> build <br /> communitiesBituminous Base Ton 15.64 22.41 22.13 20.26 22.00 20.50 22.80 25.60 <br /> Bituminous Wear Ton 24.90 23.87 27.68 23.84 24.00 22.75 26.50 29.00 <br /> B618 Curb & LF 4.05 4.85 5.50 5.50 5.15 4.80 5.60 6.10 <br /> Gutter <br /> 6" DIP Watermain LF 11.50 12.00 13.50 10.75 16.00 16.00 16.95 17.80 <br /> 12" RCP Storm LF 35.35 19.00 20.00 15.80 16.00 28.50 18.50 22.90 <br /> 40901 red circle drive Sewer <br /> box 130 <br /> minnetonka, minnesota 55343-0130 <br /> (612) 935-6901 <br /> fax (612) 935-8814 <br />
The URL can be used to link to this page
Your browser does not support the video tag.