Laserfiche WebLink
• CO[n ICUOn <br /> Schedule for <br /> The preliminary schedule for completion of the proposed project is as follows: <br /> Study Area 1 -Public Meeting October 1999 <br /> Inspections±575 Buildings November 1998 <br /> Study Area 2 _Public Meeting January 1994 <br /> Inspections±575 Buildings February 1999 <br /> Study Area 3 -Public Meeting February 1999 <br /> inspections±575 Buildings March 1999 <br /> Study Area 4 -Public Meeting March 1999 <br /> Inspections±575 Buildings April 1999 <br /> Complete±99%of Inspections June 1999 <br /> Su nmary Report July 1999 <br /> • <br />