Laserfiche WebLink
• C.7.5 Providing extensive assistance in the utilization of any equipment or system such as <br /> initial startup or testing, adjusting and balancing, preparation of operating and <br /> maintenance manuals, training personnel for operation and maintenance, and <br /> consultation during operation. <br /> C.7.6 Providing contract administration after the construction contract time has been <br /> extended from the completion date by more than 30 working days through no fault <br /> of the Engineer. <br /> C.7.7 Providing services of professional subconsultants as required for the project. <br /> C.7.8 Providing the type of surveying or related engineering services necessary for <br /> preparation and/or temporary easements. <br /> C.7.9 Serving as an expert witness for the City in any litigation or other proceedings <br /> involved in the project. <br /> C.7.10 Providing services for preparation of preliminary and final assessment rolls. <br /> C.7.11 Review of developer's plats,concept plans, and provide assistance to the developer <br /> in preparing a plat for improvement projects. <br /> • C.7.12 Prepare legal descriptions and exhibits for all permanent and temporary easements <br /> required for the project. <br /> C.7.13 Provide preliminary surveying prior to plan preparation and construction surveying <br /> necessary for construction of the project. <br /> C.7.14 Additional services in connection with the project not otherwise provided for in this <br /> Agreement. <br /> C.7.15 Within 90 days after receipt of all necessary data, prepare for City on request a set <br /> of reproducible record prints of drawings showing those changes made during the <br /> construction process,based on marked up prints,drawings,and other data furnished <br /> by the resident project representative,if one is supplied by the Engineer,or furnished <br /> in conjunction with the Contractor to the Engineer or by the City's representative and <br /> which the Engineer considers significant. <br /> C.8 SCOPE OF SERVICES FOR STUDIES <br /> Subject to further clarification on a project-by-project basis, the Engineer shall: <br /> C.8.1 NEEDS PHASE <br /> • C.8.1.1 Identify the goals of the study with City staff. <br /> Exhibit C Page 6 of 7 F:%WPW1?AMFN WAndmy%.-A c <br />