My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC RES 99-060 A RESOLUTION APPROVING A JOINT POWERS AGREEMENT WITH METROPOLITAN COUNCIL (METRO TRANSIT) RELATING TO BUS STOP SIGNS
StAnthony
>
City Council
>
City Council Resolutions
>
1999
>
CC RES 99-060 A RESOLUTION APPROVING A JOINT POWERS AGREEMENT WITH METROPOLITAN COUNCIL (METRO TRANSIT) RELATING TO BUS STOP SIGNS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 4:21:22 PM
Creation date
4/19/2016 4:21:19 PM
Metadata
Fields
SP Box #
31
SP Folder Name
RES 1999
SP Name
CC RES 99-060 A RESOLUTION APPROVING A JOINT POWERS AGREEMENT WITH METROPOLITAN COUNCIL (METRO TRANSIT) RELATING TO BUS STOP SIGNS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8/18/99 8:34 AM Cost Tabulation Sheet City enter actual quantities. <br /> Metro Transit Contract No. 98-015-72 <br /> • with the City of St.Anthony <br /> NO. DESCRIPTION QTY. UNIT TOTALS <br /> PRICE <br /> 1.0 RETROFIT/INSTALL: NEW SIGN ON EXISTING SIGN MOUNTING STRUCTURE. <br /> 1.1 Retrofit existing sign with new sign. x = $ <br /> 1.2 Install new sign on existing structure. x = $ <br /> 1.2.1 Lengthen existing pipe or post. x = $ <br /> 1.3 Install holder. x =[$ <br /> 1.4 Special 1.4: x = $ <br /> 1.0 Sub-total = $ <br /> 2.0 REMOVE: EXISTING STRUCTURE WHERE EXISTING BUS SIGN&STOP ARE VACATED/RELOCATED. <br /> 2.1 Remove and patch, soil/blacktop. 1XI $ <br /> 2.2 Remove and patch, concrete. 1XI $ <br /> 2.0 Sub-total = $ <br /> 3.0 INSTALL: NEW SIGN MOUNTING STRUCTURE AND SIGN. <br /> 3.1 U-post(concrete). x = $ <br /> 3.2 U-post(non-concrete). x = $ <br /> 3.3 Round pipe(concrete). x = $ <br /> 3.4 Round pipe (non-concrete). x = $ <br /> 3.0 Sub-total = $ <br /> • 4.0 OTHER. <br /> 4.1 Special 4.1: x = $ <br /> 4.2 Special 4.2: x = $ <br /> 4.0 Sub-total = $ <br /> GRAND TOTA = $ <br /> Agreement(unit prices) PAYMENT OPTION NO. 1 <br /> Agreement(time& material) PAYMENT OPTION NO. 2 <br /> Approx. %of work done by City's own resources. % <br /> Approx. % of work done by City's sub-contracts. % <br /> Approx. % of work done by City's agreement with Ci of <br /> Totals = % <br /> Record of revisions: by on ; by_on ; by on ; by_on <br /> ,(City or M.T.): of of of of <br /> Version <br /> v_Checked by Metro Transit Public Facilities Dept., by Date: <br /> Date received by Metro Transit: <br /> v Quantities of work performed and approx. %of work entered by Date: <br /> • <br /> Page 1 Interagency Agreement, Capital EXHIBIT D <br />
The URL can be used to link to this page
Your browser does not support the video tag.