My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC RES 99-060 A RESOLUTION APPROVING A JOINT POWERS AGREEMENT WITH METROPOLITAN COUNCIL (METRO TRANSIT) RELATING TO BUS STOP SIGNS
StAnthony
>
City Council
>
City Council Resolutions
>
1999
>
CC RES 99-060 A RESOLUTION APPROVING A JOINT POWERS AGREEMENT WITH METROPOLITAN COUNCIL (METRO TRANSIT) RELATING TO BUS STOP SIGNS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 4:21:22 PM
Creation date
4/19/2016 4:21:19 PM
Metadata
Fields
SP Box #
31
SP Folder Name
RES 1999
SP Name
CC RES 99-060 A RESOLUTION APPROVING A JOINT POWERS AGREEMENT WITH METROPOLITAN COUNCIL (METRO TRANSIT) RELATING TO BUS STOP SIGNS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8/18/99 8:36 AM PROPOSAL Pagel <br /> Metro Transit Contract No. 98-015-72 EXHIBIT C <br /> • with the City of St.Anthony <br /> Quantity UNIT <br /> NO. DESCRIPTION Estimating QTY. PRICE TOTALS <br /> Factor <br /> 1.0 RETROFIT/INSTALL: NEW SIGN ON EXISTING SIGN MOUNTING STRUCTURE. <br /> 1.1 Retrofit existing sign with new sign. 34 x $20 = 680 <br /> 1.2 Install new sign on existing structure. 12 x $20 = 240 <br /> 1.2.1 Lengthen existing pipe or post. 50%of 1.2 6 x $20 = 120 <br /> 1.3 Install holder. x $30 = 0 <br /> 1.4 Special 1.4: x = 0 <br /> 1.0 Sub-total = $1,040 <br /> 2.0 REMOVE: EXISTING STRUCTURE WHERE EXISTING BUS SIGN&STOP ARE VACATED/RELOCATED. <br /> 2.1 Remove and patch, soil/blacktop. 50% of 1.1 2 x $20 = 34 <br /> 2.2 Remove and patch, concrete. 50%of 1.1 2 x $20 = 34 <br /> 2.0 Sub-total = $68 <br /> 3.0 INSTALL: NEW SIGN MOUNTING STRUCTURE AND SIGN. <br /> 3.1 U-post(concrete). 18 x $80 = 1,434 <br /> 3.2 U-post(non-concrete). 62 x $70 = 4,346 <br /> 3.3 Round pipe(concrete). 0 x $100 = 0 <br /> 3.4 Round pipe(non-concrete). 0 x $120 = 0 <br /> 3.0 Sub-total = $5,779 <br /> • 4.0 OTHER. - <br /> 4.1 Special 4.1: x 0 <br /> 4.2 Special 4.2: x = 0 <br /> 4.0 Sub-total = $0 <br /> GRAND TOTAL = $6,887 <br /> Contingency: 10% NOT TO EXCEED = $7,576 <br /> CHECK HERE TO SELECT(unit prices) PAYMENT OPTION NO. 1 <br /> CHECK HERE TO SELECT(time& material) PAYMENT OPTION N6.2 <br /> Estimated %of work by City's own resources. 0/0 <br /> Estimated %of work by City's sub-contracts. % <br /> Estimated %of work by City's agreement with City of % <br /> �1 1 77 <br /> Record of revisions: by on ; by_on ; by on ; by_on <br /> (City or MCTO): of of ; of of <br /> Date received by MCTO: <br /> Version <br /> vl Payment Option and Estimated %of work entered b Date: <br /> Interagency Agreement, Capital EXHIBIT C <br />
The URL can be used to link to this page
Your browser does not support the video tag.