My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 09202005
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2005
>
PL PACKET 09202005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 4:25:38 PM
Creation date
4/19/2016 4:25:18 PM
Metadata
Fields
SP Box #
33
SP Folder Name
PL PACKETS 2005-2011
SP Name
PL PACKET 09202005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Thursday 02 of Jun 2005 , Xcel Energy ->6514846376 Page 3 of 4 <br /> Page 2 <br /> June 2, 2005 <br /> (4) Grade change within easement. <br /> The ground elevation within the easement shall not be increased more than 1 foot above <br /> the existing grade. Stockpiling of soil and/or material within the easement will not be <br /> permitted. <br /> (5) Clearances to equipment and workers. <br /> A working clearance of 25 feet between the electrical conductors and any cranes or <br /> digging equipment used in or near the easement,or a clearance of 25 feet to the physical <br /> proximity of workers must be maintained at all times. In addition, any construction <br /> near the transmission line(s) shall comply with all OSHA Safety Clearances. If this <br /> clearance cannot be maintained, the contractor or developer must arrange for a line <br /> outage by calling Xcel Energy's System Control department (Steve Rollin 612/330- <br /> 2875). At least two weeks advanced notice must be provided in order to schedule a line <br /> outage. There is a fee of approximately $350.00 per day, per outage, for this service <br /> This fee must be paid prior to outage. <br /> (6) Landscaping within the easement. <br /> Detailed plans for landscaping (including light standards) must be submitted to Xcel <br /> Energy for review and approval. Generally shorter varieties of trees and shrubs may be <br /> considered. If planting is pernitted, the line's voltage and the tree's mature height and <br /> the distance from the line must be considered. For maintenance purposes there shall be <br /> no planting with 15 feet of structure sites. <br /> (7) Buildung on easements. <br /> There shall be no permanent or temporary building allowed within the easement area <br /> (8) Fuel and refueling on easements. <br /> There shall be no fuel tanks stored or refueling of vehicles and equipment within the <br /> easement. <br /> (9) Fences on easements. <br /> If the easement area is fenced, gates must be installed to provide access to Xcel Energy <br /> for maintenance purposes. Chain link or other types of fences using metal material and <br /> constructed on or near an Xcel Energy easement should be properly grounded. <br />
The URL can be used to link to this page
Your browser does not support the video tag.