Laserfiche WebLink
Thursday 02 of Jun 2005, Xcel Energy ->6514846 6 Page 2 of 4 <br /> Xcel Energy <br /> NORTHERN STATES POWER <br /> 414 NICOLLET MAL]„7TH FLOOR <br /> MMNE4POUS,MN 55401 <br /> June 2, 2005 <br /> Mr. Troy Martenson <br /> 3645 Chelmsford Rd. N. <br /> St. Anthony, MN 55112 <br /> RESIDENTIAL DRIVEWAY ENCROACHMENT AGREEMENT <br /> 3645 Chelmsford Rd. N., St. Anthony, MN 55112 <br /> Stearns County <br /> Dear Troy: <br /> Our Transmission Engineers have reviewed the driveway encroachment request your submitted <br /> and has determined that the encroachment is acceptable to Xcel Energy under the following <br /> conditions: <br /> (1) Excavation close to structure location. <br /> A minimum distance of 15 feet of supported earth must be maintained from any part of <br /> the power pole. Support of the ground beyond the 15 feet may be provided by a slope <br /> no greater than three feet horizontal to one foot vertical. Support may also be provided <br /> by the use of cribbing, sheet piling, retaining wall or tunneluig. The specific plan for <br /> providing the required support and the excavation plan for the proposed project must be <br /> submitted to Xcel Energy for review and approval. <br /> (2) Grade change around structure location. <br /> Fill around or above power poles or metal tower foundations is not permitted. The <br /> grade around the power poles or metal tower must provide for surface water runoff—no <br /> surface water ponding around power poles or metal tower will be permitted. Any cost <br /> related to the adjustment of Xcel Energy's facilities will be at the requestor's expense. <br /> (3) Fill and grade change around guy wires and anchors. <br /> Fill above the steel anchor rod onto the guy wire is not permitted. The specific plan for <br /> any grade change or excavation in the vicinity of down guys and anchors must be <br /> submitted to Xcel Energy for review and approval. <br /> Page 1 of 3 <br />