Laserfiche WebLink
CSAH 136 (Silver Lake Road) Joint Task Force <br /> Meeting #4 Minutes <br /> 1. INTRODUCTIONS <br /> The meeting began informally as Task Force members reviewed two Alternative roadway <br /> layout plans, copies of which were placed on tables for easy viewing. At approximately 7:15 <br /> p.m., introductions began with Task Force members introducing themselves, including <br /> Council member Dick Horst. Hennepin County staff engineers present included Craig <br /> Twinem and Pete Lemke. Mr. Twinem introduced Hennepin County Commissioner Mark <br /> Stenglein. City staff included Jay Hartman and Todd Hubmer. Bolton & Menk engineers <br /> Dan Faulkner and Ron Roetzel were also in attendance. Commissioner Stenglein <br /> commented that he was able to get this roadway improvement project advanced and is <br /> anxious to see it get under way. <br /> Mr. Twinem indicated the consultants would explain the two Alternative layouts at the two <br /> stations set up for viewing the layout plans. The Task Force members then continued to <br /> review the plans and ask questions of the consultants and City and County staff. Each Task <br /> Force member had previously been emailed a copy of Alternatives 1 and 2, each of which <br /> included 5 sheets, along with a sheet of typical cross sections. Hard .copies of all of this <br /> material were also handed out to the Task Force members at the meeting. In addition to the <br /> continuous layout sheets of Alternatives 1 and- 2, the consultants had cross sections at the <br /> following six addresses as representative samples surveyed along the roadway corridor: <br /> 3609, 3507, 3424, 3017 and 2840 Silver Lake Road <br /> 3000 33rd Avenue <br /> These cross sections were overlayed with the Alternatives 1 and 2 to show the potential <br /> impacts to these properties at the cross section location. The impacts are slightly greater with <br /> Alternative 2 at 3609, 3507, 3017 and 2840 Silver Lake Road, due to the additional width <br /> needed for the boulevard area and the center turn lane. <br /> 2. DESIGN LAYOUT ALTERNATIVES <br /> Alternative 1 includes the following: <br /> ■ A 2-lane roadway the length of the project, except between 33rd Avenue and the <br /> fire station, where left turn lanes are added at 33rd Avenue, the northerly church <br /> entrance, the southerly City Hall entrance and at 34th Avenue; in addition, <br /> between 34th Avenue and the north side of the fire station, a continuous center <br /> turn lane is included with the improvement. <br /> ■ Right turn lanes at 29th Avenue, 33rd Avenue, the southerly entrance to City Hall <br /> and the northerly play field parking lot entrance; closure of the southerly play <br /> s h <br /> illa e <br />