Laserfiche WebLink
Mirror Lake Concept Plan <br />1)Excavate Lake <br />2)Replace Outlet <br />Structure <br />3)Construct Flood <br />Control Berm <br />4)Stabilize Shoreline <br />1) Excavate Lake <br /> •Remove <br />unconsolidated <br />nutrient rich soils <br />•Increase lake volume <br />below Normal Water <br />Level (NWL) <br />•Improve habitat <br />•Slow the <br />accumulation of <br />sediment deltas <br />•Avoid disturbing <br />NuStar’s petroleum <br />pipeline <br />31