Laserfiche WebLink
2) Replace Outlet Structure <br /> •Lower NWL <br />approximately 2 feet <br />•Increase flood storage <br />from 46 to 83 acre-feet <br />•Reduce flow rates down <br />stream during smaller <br />and extremely large <br />events <br />3) Construct Flood Control Berm <br /> <br />•Reduce risk of lake <br />overtopping <br />•If lake ever does overtop, <br />flows will be concentrated in <br />one, localized area of the <br />berm. <br />32