My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 05242016
StAnthony
>
City Council
>
City Council Packets
>
2016
>
CC PACKET 05242016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2016 1:54:57 PM
Creation date
5/25/2016 1:50:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4) Stabilize Shoreline <br /> <br />•Increase lake safety <br />•Reduce erosion <br />•Improve habitat <br />•Allow for increased <br />plant diversification <br />Project Benefits: Mirror Lake <br />•Reduce phosphorus loadings and algae blooms in <br />Mirror Lake and downstream <br />–Annual Total Phosphorus removal 50 pounds minimum <br />•Increase Flood Storage from 46 to 83 acre-feet <br />–No overtopping in the 100 year event <br />–Create designated emergency overflow <br />•Improve Public Safety <br />–10:1 bench around perimeter <br />•Improve aquatic and near-shore wildlife habitat <br />–Buffer strip around lake <br />–Establish native vegetation <br />–Establish pollinator plants <br />–Improve water quality <br />33
The URL can be used to link to this page
Your browser does not support the video tag.