Laserfiche WebLink
Housing and Redevelopment Authority Meeting Minutes <br />• October 8, 1996 <br />Page 2 <br />C. No. 18. Elevation Changes at Site. Narrow Access Road, Provide Bus Stop <br />Connection, <br />D. No. 19. Changes Related to Moving Council Bench. <br />E. No. 20. Landscape Material, <br />6 Mr. Jim O'Brien, Williams/O'Brien Associates, Inc. explained that Change Order <br />7 No. 18 reduced the width of the access drive from 24 to 22 feet to avoid trees <br />8 located in the area. The grading on the rear portion of the site will also be <br />9 changed and the water retention area will not be as deep as the original design. <br />10 This will result in the need of increased fill. This change order will result in a <br />11 charge of $1,093.00. <br />12 Mayor Ranallo stated he had received several calls regarding the elevation of the <br />13 driveway coming into the site. <br />14 Mr. O'Brien stated that elevation had been corrected today. <br />15 Mr. O'Brien suggested the Council defer a decision on Change Order No. 19 as he <br />16 felt the cost of the electrical work could be reduced. The current cost is $7,140.00 <br />40 and Mr. O'Brien stated he felt it could be reduced by $1,200.00 to $1,500.00. <br />18 There was Council consensus to approve Change Order No. 19 not to exceed <br />19 $7,140.00, with the understanding that the final cost will be considerably less. <br />20 Mr. O'Brien explained the landscaping in Change Order No. 20 will include <br />21 Evergreens, Spreading Ewes, and Linden trees. He explained the placement of the <br />22 flag poles and stated four trees in pots will be located off center in the front of the <br />23 building to block the skylights. It was noted that the cost of this landscape <br />24 material is $9,125.00 and $20,000.00 was included in the budget for the landscape <br />25 material. <br />26 Motion by Marks, second by Wagner to approve Change Order No. 16, No. 17 <br />27 and No. 18 as stated, Change Order No. 19 not to exceed $7,140.00, with the <br />28 understanding that the final cost will be considerably less, and Change Order No. <br />29 20 at a cost of $9,125.00. <br />30 Motion carried unanimously. <br />31 Mr. O'Brien provided an update on the new City Hall/Community Center. He <br />32 reported the windows will be installed on Thursday or Friday and temporary <br />heating will be connected. The taping and painting has been postponed until the <br />heat is connected. The sprinkler work will be done at the end of the week and the <br />35 bituminous work will be started tomorrow. There has been some coordination <br />