My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08232016
StAnthony
>
City Council
>
City Council Packets
>
2016
>
CC PACKET 08232016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 3:33:17 PM
Creation date
8/18/2016 3:30:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
No.Mat. No.Item Units Estimated <br />Unit Price <br />Estimated <br />Quantity <br />Estimated <br />Cost <br />SCHEDULE C - WATER SYSTEM IMPROVEMENTS <br />78 2104.501 REMOVE WATER MAIN LIN FT $3.50 4,300 $15,050.00 <br />79 2104.509 REMOVE WATER SERVICE AND CURB BOX EACH $100.00 72 $7,200.00 <br />80 2104.509 REMOVE HYDRANT AND VALVE EACH $250.00 7 $1,750.00 <br />81 2104.509 REMOVE GATE VALVE & BOX EACH $200.00 14 $2,800.00 <br />82 2504.601 TEMPORARY WATER SERVICE LUMP SUM $5,000.00 1 $5,000.00 <br />83 2504.602 RECONNECT WATER SERVICE EACH $250.00 72 $18,000.00 <br />84 2504.602 CONNECT TO EXISTING WATER MAIN EACH $1,000.00 4 $4,000.00 <br />85 2504.602 1" CORPORATION STOP EACH $200.00 72 $14,400.00 <br />86 2504.602 8" GATE VALVE AND BOX EACH $2,000.00 15 $30,000.00 <br />87 2504.602 1" CURB STOP & BOX EACH $300.00 72 $21,600.00 <br />88 2504.602 HYDRANT ASSEMBLY EACH $5,000.00 10 $50,000.00 <br />89 2504.603 1" TYPE K COPPER PIPE LIN FT $21.00 2,300 $48,300.00 <br />90 2504.603 6" WATER MAIN-DUCT IRON CL 52 W/ POLY WRAP LIN FT $32.00 150 $4,800.00 <br />91 2504.603 8" WATER MAIN-DUCT IRON CL 52 W/ POLY WRAP LIN FT $36.00 4,800 $172,800.00 <br />92 2504.604 4" POLYSTYRENE INSULATION SQ YD $50.00 200 $10,000.00 <br />93 2504.608 DUCTILE IRON FITTINGS POUND $3.50 4,400 $15,400.00 <br />$421,100.00 <br />$42,110.00 <br />$463,210.00 <br />$115,802.50 <br />$579,012.50 <br />ST ANTHONY, MN <br />AUGUST 23, 2016 <br />OPINION OF PROBABLE COSTS <br />2017 STREET AND UTILITY IMPROVEMENT PROJECT <br />PROJECT NO. 2170-34 <br />SUBTOTAL SCHEDULE C - WATER SYSTEM IMPROVEMENTS <br />+ 10% CONTINGENCIES <br />SUBTOTAL SCHEDULE C - WATER SYSTEM IMPROVEMENTS <br />+ 25% ADMINISTRATIVE, LEGAL, ETC. <br />TOTAL SCHEDULE C - WATER SYSTEM IMPROVEMENTS <br />43
The URL can be used to link to this page
Your browser does not support the video tag.