Laserfiche WebLink
No.Mat. No.Item Units Estimated <br />Unit Price <br />Estimated <br />Quantity <br />Estimated <br />Cost <br />SCHEDULE D - DRAINAGE IMPROVEMENTS <br />94 2104.501 REMOVE SEWER PIPE (STORM)LIN FT $10.00 1,000 $10,000.00 <br />95 2104.501 REMOVE CASTING ASSEMBLY EACH $100.00 14 $1,400.00 <br />96 2104.509 REMOVE DRAINAGE STRUCTURE EACH $350.00 14 $4,900.00 <br />97 2503.541 15" RC PIPE SEWER DESIGN 3006 CLASS V LIN FT $36.00 600 $21,600.00 <br />98 2503.541 18" RC PIPE SEWER DESIGN 3006 CLASS V LIN FT $38.00 900 $34,200.00 <br />99 2503.541 21" RC PIPE SEWER DESIGN 3006 CLASS V LIN FT $40.00 200 $8,000.00 <br />100 2503.541 24" RC PIPE SEWER DESIGN 3006 CLASS V LIN FT $45.00 200 $9,000.00 <br />101 2503.602 CONNECT TO EXISTING DRAINAGE STORM SEWER EACH $1,200.00 10 $12,000.00 <br />102 2506.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 LIN FT $300.00 60 $18,000.00 <br />103 2506.502 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1 EACH $1,800.00 10 $18,000.00 <br />104 2506.602 CASTING ASSEMBLY (STORM)EACH $650.00 30 $19,500.00 <br />$156,600.00 <br />$15,660.00 <br />$172,260.00 <br />$43,065.00 <br />$215,325.00 <br />SUBTOTAL SCHEDULE D - DRAINAGE IMPROVEMENTS <br />+ 10% CONTINGENCIES <br />SUBTOTAL SCHEDULE D - DRAINAGE IMPROVEMENTS <br />+ 25% ADMINISTRATIVE, LEGAL, ETC. <br />TOTAL SCHEDULE D - DRAINAGE IMPROVEMENTS <br />OPINION OF PROBABLE COSTS <br />2017 STREET AND UTILITY IMPROVEMENT PROJECT <br />PROJECT NO. 2170-34 <br />ST ANTHONY, MN <br />AUGUST 23, 2016 <br />44