Laserfiche WebLink
qP Johnson �� <br />�f <br />Controls <br />City -Wide <br />Install Metasys Building Automation System with graphical user interface <br />City to provide JCI server space and a data drop for JCI - provided server. The City will <br />also provide each building engineer a workstation loaded with a web browser. <br />Minimum requirements: 2.8 GHz, 1 GB RAM and 80 GB hard drive and CD drive, <br />NIC (Network Interface Card) and Windows XP Service Pack 2 <br />Operator training — 8 hours <br />CH2 City Hall <br />• See HVAC Systems and Controls Replacement <br />Fire Station <br />FS2 0 Implement Start / Stop Schedule <br />o DEC Start/ Stop of two Air Handling Units <br />FS7 • Replace existing fans with new destratification fans in selected high bay areas <br />o Six (6) in Main Bay Area <br />PWI Public Works <br />• Move existing thermostat from locker room to office area. <br />LS2 I Liquor Stores <br />• Implement Start / Stop Schedule <br />• DDC Start / Stop of two Air Handling Units (South Store) <br />• DEC Start/ Stop of one Air Handling Unit (North Store) <br />Cooler temperature monitoring (Both Stores) <br />Rebalancing the North Store. <br />o Provide more ventilation to the office space <br />o Provide Enable and Disable of the electric heat of the office space. <br />Risks of not implementing the recommendations <br />• Continued complaints of "too hot or too cold" conditions. <br />• Continuous escalation of energy cost based on unbalanced systems. <br />• Increase in maintenance and repair costs due to the HVAC system running "out -of- <br />balance". <br />• Unanticipated equipment failures can <br />• Saves energy <br />• Operational efficiency <br />• Control system standardization <br />• Enhanced maintenance staff productivity <br />• Ease of use — Centralized System <br />• Tnrraacnd ­P_— E__ <br />Page it City of St. Anthony Village <br />_ Performance Contract Analysis PRORPIETARY AND NOT TO BE REPRODUCED OR DISTR BWED WITHOUT JOHNSON CONTROLS' PERMISSION <br />