My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION 01292008
StAnthony
>
City Council
>
City Council Work Session
>
2008
>
CC WORKSESSION 01292008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2016 10:44:00 AM
Creation date
11/23/2016 10:39:48 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
qP Johnson �� <br />�f <br />Controls <br />City -Wide <br />Install Metasys Building Automation System with graphical user interface <br />City to provide JCI server space and a data drop for JCI - provided server. The City will <br />also provide each building engineer a workstation loaded with a web browser. <br />Minimum requirements: 2.8 GHz, 1 GB RAM and 80 GB hard drive and CD drive, <br />NIC (Network Interface Card) and Windows XP Service Pack 2 <br />Operator training — 8 hours <br />CH2 City Hall <br />• See HVAC Systems and Controls Replacement <br />Fire Station <br />FS2 0 Implement Start / Stop Schedule <br />o DEC Start/ Stop of two Air Handling Units <br />FS7 • Replace existing fans with new destratification fans in selected high bay areas <br />o Six (6) in Main Bay Area <br />PWI Public Works <br />• Move existing thermostat from locker room to office area. <br />LS2 I Liquor Stores <br />• Implement Start / Stop Schedule <br />• DDC Start / Stop of two Air Handling Units (South Store) <br />• DEC Start/ Stop of one Air Handling Unit (North Store) <br />Cooler temperature monitoring (Both Stores) <br />Rebalancing the North Store. <br />o Provide more ventilation to the office space <br />o Provide Enable and Disable of the electric heat of the office space. <br />Risks of not implementing the recommendations <br />• Continued complaints of "too hot or too cold" conditions. <br />• Continuous escalation of energy cost based on unbalanced systems. <br />• Increase in maintenance and repair costs due to the HVAC system running "out -of- <br />balance". <br />• Unanticipated equipment failures can <br />• Saves energy <br />• Operational efficiency <br />• Control system standardization <br />• Enhanced maintenance staff productivity <br />• Ease of use — Centralized System <br />• Tnrraacnd P_— E__ <br />Page it City of St. Anthony Village <br />_ Performance Contract Analysis PRORPIETARY AND NOT TO BE REPRODUCED OR DISTR BWED WITHOUT JOHNSON CONTROLS' PERMISSION <br />
The URL can be used to link to this page
Your browser does not support the video tag.