My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 02142017
StAnthony
>
City Council
>
City Council Packets
>
2017
>
CC PACKET 02142017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2017 11:22:36 AM
Creation date
2/9/2017 2:06:12 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> THE VILLAGE LLC 11/11/2016 <br />TRAFFIC STUDY <br />CITY OF SAINT ANTHONY <br />WSB PROJECT NO. 2170-380 PAGE 25 <br /> <br /> <br />Based on the analysis mitigation improvements are recommended for 2018 with the <br />proposed development and by 2030 as the area continues to develop. These <br />recommendations include: <br /> <br />2018 with Lowry Grove Development: <br /> <br />1. Optimize the signal time and coordination between the St Anthony Blvd <br />intersections at New Brighton Blvd (CR 88) and Silver Lake Rd (CR 136)/Kenzie <br />Terrace (CR 153). <br /> <br />2. Lengthen the northwest bound left turn lane from St Anthony Blvd to southbound <br />New Brighton Blvd (CR 88) from 125 feet to 200 feet. <br /> <br />3. Lengthen the northeast bound right turn lane from Kenzie Terrace (CR 153) to <br />southeast St Anthony Blvd from 170 feet to 200 feet. <br /> <br />4. Lengthen the southwest bound left turn from Silver Lake Rd (CR 136) to southeast <br />St Anthony Blvd from 100 feet to 175 feet. <br /> <br />5. Lengthen the westbound left turn from Kenzie Terrace (CR 153) to southbound NE <br />Stinson Parkway by shortening or removing the existing left turn lane from Kenzie <br />Terrace to the Bremer Bank Building. <br /> <br />6. Lengthen the northbound left turn from NE Stinson Parkway to westbound NE <br />Lowry Ave from 150 feet to 300 feet. <br /> <br />7. At the proposed site driveway at Wilson St on Kenzie Terrace (CR 153) provide: <br /> <br />a. Two lanes exiting the site (one left turn and one through/right lane) <br />b. Left turn lane from Kenzie Terrace (CR 153) into the site <br />c. Right turn lane from Kenzie Terrace (CR 153) into the site <br /> <br />2030 with Future Area Development: <br /> <br />1. Consider a dual roundabout or other traffic control improvements for the St <br />Anthony Blvd intersections at New Brighton Blvd (CR 88) and Silver Lake Rd (CR <br />136)/Kenzie Terrance (CR 153). <br /> <br />2. Consider a roundabout or other traffic control improvements at the intersection of <br />Kenzie Terrace (CR 153)/NE Lowry Ave at NE Stinson Parkway. <br /> <br />124
The URL can be used to link to this page
Your browser does not support the video tag.