Laserfiche WebLink
The Village, LLC Redevelopment EAW – Record of Decision <br />City of Saint Anthony Village <br />WSB Project No. 2170-380 Page 4 <br />tetrachloroehtene were detected in the ground water at the project site. <br />Excavation during construction is likely to encounter contaminated soil and/or <br />groundwater that will require special management during construction. <br />Additionally, previous Phase II ESA information indicates the property soil is <br />regulated for DRO and VOCs in select areas. A Voluntary Response Action Plan <br />(VRAP) has been prepared for the proposed project and has been approved by <br />the MPCA. <br />The project will involve demolition of buildings. The buildings will need to be <br />inspected for regulated materials prior to demolition. If regulated materials are <br />found they will need to be handled and disposed of in accordance with state and <br />local regulations. <br />Transportation (Parking and Traffic) - A Traffic Impact Study was completed for <br />the project. This Study provided a comprehensive look at anticipated traffic <br />impacts for the regional area. The Traffic Study identified recommended <br />mitigation improvements for 2018 with the proposed development and by 2030 <br />as the area develops. These recommendations include: <br />1. 2018 with The Village, LLC Development: <br />• Optimize the signal time and coordination between the St Anthony Blvd <br />intersections at New Brighton Blvd (CR 88) and Silver Lake Blvd/Kenzie <br />Terrance (CR 153). <br />• Lengthen the northwest bound left turn lane from St Anthony Blvd to <br />southbound New Brighton Blvd (CR 88) from 125 feet to 200 feet. <br />• Lengthen the northeast bound right turn lane from Kenzie Terrace (CR <br />153) to southeast St Anthony Blvd from 170 feet to 200 feet. <br />• Lengthen the southwest bound left turn from Silver Lake Blvd (CR 153) <br />to southeast St Anthony Blvd from 100 feet to 175 feet. <br />• Lengthen the westbound left turn from Kenzie Terrace (CR 153) to <br />southbound NE Stinson Parkway (CR 27) by shortening or removing the <br />existing left turn lane from Kenzie Terrace to the Bremer Bank Building. <br />• Lengthen the northbound left turn from NE Stinson Parkway to <br />westbound NE Lowry Ave from 150 feet to 300 feet. <br />• At the proposed site driveway at Wilson St on Kenzie Terrace (CR 153) <br />provide: <br />o Two lanes exiting the site (one left turn and one through/right <br />lane) <br />o Left turn lane from Kenzie Terrace (CR 153) into the site <br />o Right turn lane from Kenzie Terrace (CR 153) into the site <br /> <br />2. 2030 with Future Area Development: <br />• Consider a dual roundabout or other intersection control improvements <br />for the St Anthony Blvd intersections at New Brighton Blvd (CR 88) and <br />Silver Lake Blvd/Kenzie Terrance (CR 153). <br />• Consider a roundabout or other intersection control improvements at the <br />23