Laserfiche WebLink
page 3 <br />6. Project Description: <br />a. Provide the brief project summary to be published in the EQB Monitor, (approximately 50 <br />words). <br /> <br />The proposed project will involve the redevelopment of an existing 15-acre manufactured <br />home/RV park community, which holds 98 manufactured homes and 95 R.V. sites, into a <br />combination of multi-family residential units (townhomes and apartments). The project is <br />proposed to construct approximately 837 units. <br /> <br />b. Give a complete description of the proposed project and related new construction, including <br />infrastructure needs. If the project is an expansion include a description of the existing facility. <br />Emphasize: 1) construction, operation methods and features that will cause physical <br />manipulation of the environment or will produce wastes, 2) modifications to existing equipment <br />or industrial processes, 3) significant demolition, removal or remodeling of existing structures, <br />and 4) timing and duration of construction activities. <br /> <br />The proposed project will result in the redevelopment of an approximately 15-acre parcel from an <br />existing manufactured home community with approximately 98 home sites and 95 RV sites to a <br />medium- and high-density residential development containing a total of approximately 837 units. <br /> <br />As part of the redevelopment, the existing manufactured homes and RVs will be moved out of the <br />project area. Existing pavement and utilities will be removed. All homes and buildings will be <br />inspected for lead and asbestos and demolished. If lead or asbestos-containing materials are <br />discovered, they will be disposed of at a facility licensed to handle that type of hazardous <br />material. Approximately 15.38 acres of soil will be graded as part of the project. An estimated <br />65,000 cubic yards of cut and fill will occur on site, and is expected to result in a net balance. <br />This includes excavation for the below-grade levels of the proposed buildings. Excess material <br />unsuitable for foundation soils may require export from the site. Improved foundation material <br />will be imported onsite as necessary. Equipment such as graders and backhoes will be used to <br />grade the site and excavate soils. <br /> <br />Five multi-unit buildings will be constructed as part of the redevelopment (Figure 4). The tallest <br />of the buildings will be 5 stories (56 feet). The total number of units within the buildings will be <br />approximately 800 units. An additional 37 2- to 3-story townhome units will also be constructed. <br />Construction methods will be typical of building construction and will include equipment such as <br />graders, backhoes, and cranes. The buildings will be constructed using wood, steel and concrete. <br />New utilities, including sanitary sewer will be installed and connected to the buildings. <br />Construction waste produced during the construction of the project will be disposed of by a <br />license garbage hauler serving the Saint Anthony Village area. No hazardous wastes will be <br />produced during construction. <br /> <br />Interior roadways will be constructed throughout the project area to provide access to neighboring <br />roadways and individual buildings/parking areas. Some interior roadways will allow parking. The <br />dimensions of the proposed roadways are approximate: <br /> <br /> without parking: 28 feet <br /> with parking along one side: 37 feet <br /> with parking along both sides: 48 feet <br />38