Laserfiche WebLink
page 4 <br /> <br />The roads will be constructed using typical road construction methods and will be paved with <br />bituminous pavement. Stormsewer will be constructed along with the roadways to collect runoff <br />from storm events. Stormwater from the roadways and other impervious surfaces will be <br />generally routed to a stormwater treatment system located within the redevelopment site. <br /> <br />The proposed redevelopment is anticipated to begin in summer 2017 with the removal of the <br />manufactured homes. Grading of the project area is expected to begin in summer 2017, and <br />construction of the buildings will be phased and construction will occur an approximately 5 year <br />timeframe. The townhomes are anticipated to be constructed first followed by the apartments and <br />senior co-op depending on demand. The project is expected to be completed in 2022. <br /> <br />c. Project magnitude <br /> <br />Table 1: Project Magnitude <br /> <br />Total Project Acreage 15.44 <br />Linear project length NA <br />Number and type of residential units Apartment – 700 units <br />Townhomes – 37 units <br />Senior Co-op – 200 units <br />Commercial building area (in square feet) N/A <br />Industrial building area (in square feet) N/A <br />Institutional building area (in square feet) N/A <br />Other uses – specify (in square feet) N/A <br />Structure height(s) 56 feet <br /> <br /> <br />d. Explain the project purpose; if the project will be carried out by a governmental unit, explain the <br />need for the project and identify its beneficiaries. <br /> <br />The purpose of the project is to redevelop an existing 15-acre manufactured home community and <br />RV park into a mixed-use housing development that will provide a variety of housing options to <br />more than 800 families. The project is being carried out by Continental Property Group, a private <br />developer. <br /> <br />e. Are future stages of this development including development on any other property planned or <br />likely to happen? Yes X No <br /> <br /> If yes, briefly describe future stages, relationship to present project, timeline and plans for <br />environmental review. <br /> <br />f. Is this project a subsequent stage of an earlier project? Yes X No <br /> If yes, briefly describe the past development, timeline and any past environmental review. <br />39