Laserfiche WebLink
page 5 <br />7. Cover types: Estimate the acreage of the site with each of the following cover types before and after <br />development: <br /> <br /> Table 2: Cover Types (all acreages are approximate) <br /> <br /> Before After <br />Wetlands 0 0 <br />Deep <br />water/streams <br />0 0 <br />Wooded/forest 0 0 <br />Brush/Grassland 0 0 <br />Cropland 0 0 <br />Lawn/landscaping 8.82 <br />acres <br />5.78 <br />acres <br />Impervious <br />surface <br />6.56 <br />acres <br />9.6 <br />acres <br />Stormwater Pond 0 0 <br />Other (describe) 0 0 <br />TOTAL 15.38 <br />acres <br />15.38 <br />acres <br /> <br /> <br />8. Permits and approvals required: List all known local, state and federal permits, approvals, <br />certifications and financial assistance for the project. Include modifications of any existing permits, <br />governmental review of plans and all direct and indirect forms of public financial assistance <br />including bond guarantees, Tax Increment Financing and infrastructure. All of these final decisions <br />are prohibited until all appropriate environmental review has been completed. See Minnesota Rules, <br />Chapter 4410.3100. <br /> <br />Table 3: Permits and Approval Required <br /> <br />Unit of government Type of application Status <br />State <br />Minnesota Pollution Control Agency NPDES Construction Stormwater Permit To be obtained <br />Minnesota Pollution Control Agency Sanitary Sewer Connection To be obtained <br />State Statue Governing Manufactured <br />Home Park Closure <br />Compliance with procedure To be obtained <br />Metropolitan Council MCES Permit To be obtained, <br />if necessary <br />County <br />Hennepin County Roadway Access to Kenzie Terrace To be obtained <br />Local <br />City of St. Anthony Land Use Application Under Review <br />City of St. Anthony Declaration of Need for an EIS To be obtained <br />City of St. Anthony Building and/or grading permits To be obtained <br />Mississippi River WMO permitting Surface water <br />Minneapolis Park and Recreation Roadway Access to Stinson Parkway To be obtained <br />40