My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015 Public Works Department Annual Report
StAnthony
>
Administration
>
Annual Reports
>
Public Works Annual Reports
>
2015 Public Works Department Annual Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2017 1:27:17 PM
Creation date
3/16/2017 1:26:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2015 Annual Report • Public Works Department • St. Anthony Village, Minnesota <br /> <br /> <br /> <br />12 <br /> <br />Highway Safety Improvement Program Grant <br />The city received a Highway Safety Improvement Program (HSIP) grant to construct sidewalks <br />and upgrade eight traffic signals within the community. The construction of a sidewalk along <br />the south side of 37th Avenue between Highcrest Road and Stinson Boulevard has been a <br />community goal to provide safer access to Wilshire Park Elementary School; to provide <br />residents with an ability to get from residential areas safely to local restaurants, parks, and <br />commercial nodes; and to provide safer and easier access to Metro Transit bus stops. <br /> <br />Along with the construction of the sidewalks, the city is upgrading eight traffic signals to <br />provide for safer pedestrian crossing and be in conformance with the American with Disabilities <br />Act. This includes upgrading pedestrian ramps, providing countdown timers, providing audio <br />queues for the visually impaired and relocating push buttons to accessible locations. The <br />design and ROW work was undertaken in 2015 and construction is anticipated in 2016. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.