My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08222017
StAnthony
>
City Council
>
City Council Packets
>
2017
>
CC PACKET 08222017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2017 9:57:40 AM
Creation date
8/22/2017 1:31:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />2018 STREET AND UTILITY IMPROVEMENT PROJECT <br />FEASIBILITY REPORT <br />CITY OF ST. ANTHONY VILLAGE <br />WSB PROJECT NO. 010507-000 PAGE 4 <br />3. EXISTING CONDITIONS <br /> <br />3.1 Sanitary Sewer <br /> <br />The sanitary sewer system in the project area consists of 9-inch-diameter vitrified clay <br />pipe (VCP) installed in the early 1960’s. The joint sealing material in use at that time was <br />typically an oakum and bituminous material. An internal inspection, with a specially <br />designed television camera, will be completed with final design to determine the <br />structural condition of the existing pipe and individual services. <br /> <br />Internal inspections of the sanitary sewer system within the proposed project area were <br />completed erlier this year. The inspection found the structural condition of the pipe to <br />vary between fair and poor, with numerous offset joints, cracked segments, dips with <br />solids deposition, and some root intrusion and mineral deposits at joints. <br />3.2 Water Main <br />The existing water distribution mains in the project area were also installed in the early <br />1960’s and consist of 6-inch cast iron pipe (CIP) main line along Macalaster Drive and <br />Foss Road, and Highcrest Road. This system has had numerous breaks over the past few <br />years and breaks will become more likely as the pipes have exceeded 50 years of service. <br />In addition, the cast iron pipes are likely heavily corroded and possibly leaking. <br />3.3 Storm Sewer <br />The existing storm sewer system in the project area consists of 15-inch reinforced <br />concrete pipe (RCP) along Foss Road from 37th Avenue to Chandler Drive, 36-inch RCP <br />along Highcrest Road from 37th Avenue to the dead end, and no storm sewer system <br />along Macalaster Drive. <br /> <br />The existing storm sewer system on Foss Road collects runoff from Foss Road only and <br />conveys stormwater to the existing storm sewer system on Chandler Drive. In addition to <br />collecting runoff from Highcrest Road, the existing storm sewer along Higcrest Road <br />conveys stormwater collected from other areas in the city to Mirror Lake. <br />3.4 Streets <br />The proposed reconstruction area consists of 24-32 foot-wide concrete streets with curb <br />and gutter. Soil borings will be completed during final design to determine the <br />underlying soils in the area. Soil borings completed with the 2009 Street and Utility <br />Improvements project on nearby Chandler Drive indicated the underlying soils consist of <br />silty clay fill or sandy clay fill. Given the the close proximity of the roads reconstructed <br />in 2009, the underlying soils are assumed to be similar. <br /> <br /> <br />30