My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08222017
StAnthony
>
City Council
>
City Council Packets
>
2017
>
CC PACKET 08222017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2017 9:57:40 AM
Creation date
8/22/2017 1:31:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM NO. DESCRIPTION UNITS ESTIMATED <br />QUANTITY <br />UNIT PRICE <br />BID <br />ESTIMATED <br />TOTAL <br />2104.501 REMOVE SEWER PIPE (SANITARY)L F 2480 $3.50 $8,680.00 <br />2104.509 REMOVE SANITARY SEWER SERVICE EACH 24 $100.00 $2,400.00 <br />2104.509 REMOVE MANHOLE (SANITARY)EACH 8 $500.00 $4,000.00 <br />2451.602 AGGREGATE BEDDING (LV)C Y 200 $40.00 $8,000.00 <br />2503.601 SANITARY SEWER BYPASS PUMPING L S 1 $5,000.00 $5,000.00 <br />2503.602 CONNECT TO EXISTING SANITARY SEWER EACH 3 $2,000.00 $6,000.00 <br />2503.602 CONNECT TO EXISTING SANITARY SEWER MANHOLE EACH 1 $2,000.00 $2,000.00 <br />2503.602 CONNECT TO EXISTING SANITARY SEWER SERVICE EACH 24 $200.00 $4,800.00 <br />2503.602 CHIMNEY SEALS EACH 8 $300.00 $2,400.00 <br />2503.602 8"X6" PVC WYE EACH 24 $350.00 $8,400.00 <br />2503.603 6" PVC PIPE SEWER ‐ SDR 26 L F 720 $28.00 $20,160.00 <br />2503.603 TELEVISE SANITARY SEWER L F 2480 $2.00 $4,960.00 <br />2503.603 8" PVC PIPE SEWER ‐ SDR 35 L F 2480 $40.00 $99,200.00 <br />2506.516 CASTING ASSEMBLY (SANITARY)EACH 8 $650.00 $5,200.00 <br />2506.603 CONST 48" DIA SAN SEWER MANHOLE L F 96 $200.00 $19,200.00 <br />$200,400.00 <br />+10% CONTINGENCY $20,040.00 <br />SUBTOTAL CONSTRUCTION COST SCHEDULE B. ‐ SANITARY SEWER IMPROVEMENTS $220,440.00 <br />+25% INDIRECT COSTS $55,110.00 <br />GRAND TOTAL CONSTRUCTION COST SCHEDULE B. ‐ SANITARY SEWER IMPROVEMENTS $275,550.00 <br />TOTAL CONSTRUCTION COST SCHEDULE B. ‐ SANITARY SEWER IMPROVEMENTS <br />SCHEDULE B. ‐ SANITARY SEWER IMPROVEMENTS <br />OPINION OF PROBABLE COSTS <br />2018 STREET AND UTILITY IMPROVEMENT PROJECT <br />PROJECT NO. 010507‐000 <br />ST ANTHONY, MN <br />JULY 28, 2017 <br />52
The URL can be used to link to this page
Your browser does not support the video tag.