Laserfiche WebLink
ITEM NO. DESCRIPTION UNITS ESTIMATED  <br />QUANTITY <br />UNIT PRICE  <br />BID <br />ESTIMATED  <br />TOTAL <br />2104.501 REMOVE WATER MAIN L F 3440 $4.00 $13,760.00 <br />2104.509 REMOVE WATER SERVICE AND CURB BOX EACH 14 $150.00 $2,100.00 <br />2104.509 REMOVE HYDRANT AND VALVE EACH 6 $400.00 $2,400.00 <br />2104.509 REMOVE GATE VALVE & BOX EACH 10 $200.00 $2,000.00 <br />2451.602 AGGREGATE BEDDING (LV)C Y 200 $40.00 $8,000.00 <br />2504.601 TEMPORARY WATER SERVICE L S 1 $30,000.00 $30,000.00 <br />2504.602 CONNECT TO EXISTING WATER SERVICE EACH 14 $1,000.00 $14,000.00 <br />2504.602 CONNECT TO EXISTING WATER MAIN EACH 14 $1,500.00 $21,000.00 <br />2504.602 2" CORPORATION STOP EACH 14 $600.00 $8,400.00 <br />2504.602 6" GATE VALVE AND BOX EACH 10 $1,800.00 $18,000.00 <br />2504.602 8" GATE VALVE AND BOX EACH 5 $2,400.00 $12,000.00 <br />2504.602 2" CURB STOP & BOX EACH 14 $750.00 $10,500.00 <br />2504.602 HYDRANT ASSEMBLY EACH 9 $5,800.00 $52,200.00 <br />2504.603 2" TYPE K COPPER PIPE L F 320 $30.00 $9,600.00 <br />2504.603 6" WATER MAIN‐DUCT IRON CL 52 W/ POLY WRAP L F 720 $42.00 $30,240.00 <br />2504.603 8" WATER MAIN‐DUCT IRON CL 52 W/ POLY WRAP L F 2660 $46.00 $122,360.00 <br />2504.604 4" POLYSTYRENE INSULATION S Y 200 $50.00 $10,000.00 <br />2504.608 DUCTILE IRON FITTINGS POUND 3000 $4.00 $12,000.00 <br />$378,560.00 <br />+10% CONTINGENCY $37,860.00 <br />SUBTOTAL CONSTRUCTION COST SCHEDULE C. ‐ WATERMAIN IMPROVEMENTS $416,420.00 <br />+25% INDIRECT COSTS $104,110.00 <br />GRAND TOTAL CONSTRUCTION COST SCHEDULE C. ‐ WATERMAIN IMPROVEMENTS $520,530.00 <br />TOTAL CONSTRUCTION COST SCHEDULE C. ‐ WATERMAIN IMPROVEMENTS <br />SCHEDULE C. ‐ WATERMAIN IMPROVEMENTS <br />OPINION OF PROBABLE COSTS <br />2018 STREET AND UTILITY IMPROVEMENT PROJECT <br />PROJECT NO. 010507‐000 <br />ST ANTHONY, MN <br />JULY 28, 2017 <br />53