Laserfiche WebLink
ITEM NO. DESCRIPTION UNITS ESTIMATED  <br />QUANTITY <br />UNIT PRICE  <br />BID <br />ESTIMATED  <br />TOTAL <br />2104.501 MOBILIZATION LS 1 $7,500.00 $7,500.00 <br />2104.509 SALVAGE AND REINSTALL LANDSCAPE EA 1 $1,500.00 $1,500.00 <br />2104.509 LIFT STATION AND PUMP LS 1 $50,000.00 $50,000.00 <br />2451.602 ELECTRICAL SERVICE LS 1 $5,000.00 $5,000.00 <br />2503.541 4" HDPE PIPE SEWER (DIRECTIONALLY DRILLED)LF 300 $65.00 $19,500.00 <br />2503.541 4" HDPE PIPE SEWER (DIRECTIONALLY DRILLED)LF 700 $45.00 $31,500.00 <br />2503.541 CONNECT INTO EXISTING DRAINAGE STRUCTURE EA 3 $1,500.00 $4,500.00 <br />2573.533 SEDIMENT CONTROL LOG TYPE STRAW L F 200 $2.00 $400.00 <br />2575.605 BLOWN COMPOST SEEDING S Y 400 $2.00 $800.00 <br />$120,700.00 <br />+15% CONTINGENCY $18,110.00 <br />SUBTOTAL CONSTRUCTION COST SCHEDULE F. ‐ CENTRAL PARK SPLASH PAD WATER RESUSE IMPROVEMENT $138,810.00 <br />+25% INDIRECT COSTS $34,710.00 <br />GRAND TOTAL CONSTRUCTION COST SCHEDULE F. ‐ CENTRAL PARK SPLASH PAD WATER RESUSE IMPROVEMENT $173,520.00 <br />TOTAL CONSTRUCTION COST SCHEDULE F. ‐ CENTRAL PARK SPLASH PAD WATER RESUSE IMPROVEMENT <br />SCHEDULE F. ‐ CENTRAL PARK SPLASH PAD WATER RESUSE IMPROVEMENT <br />OPINION OF PROBABLE COSTS <br />2018 STREET AND UTILITY IMPROVEMENT PROJECT <br />PROJECT NO. 010507‐000 <br />ST ANTHONY, MN <br />JULY 28, 2017 <br />56