My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08222017
StAnthony
>
City Council
>
City Council Packets
>
2017
>
CC PACKET 08222017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2017 9:57:40 AM
Creation date
8/22/2017 1:31:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM NO. DESCRIPTION UNITS ESTIMATED <br />QUANTITY <br />UNIT PRICE <br />BID <br />ESTIMATED <br />TOTAL <br />2021.501 MOBILIZATION L S 1 $5,000.00 $5,000.00 <br />2104.501 REMOVE AND REPLACE CONCRETE CURB AND GUTTER L F 200 $40.00 $8,000.00 <br />2104.505 REMOVE BITUMINOUS PAVEMENT S Y 50 $10.00 $500.00 <br />2231.501 BITUMINOUS PATCHING MIXTURE TON 10 $210.00 $2,100.00 <br />2232.501 MILL BITUMINOUS SURFACE (1.75")S Y 2950 $3.00 $8,850.00 <br />2331.501 JOINT ADHESIVE ‐ MASTIC L F 1700 $1.00 $1,700.00 <br />2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALLON 300 $3.00 $900.00 <br />2360.501 TYPE SP 12.5 WEARING COURSE MIX (2,B)TON 360 $65.00 $23,400.00 <br />2503.602 CHIMNEY SEALS EACH 3 $400.00 $1,200.00 <br />2504.602 ADJUST GATE VALVE AND BOX EACH 2 $500.00 $1,000.00 <br />2506.516 CASTING ASSEMBLY (SANITARY)EACH 3 $650.00 $1,950.00 <br />2531.507 6" CONCRETE DRIVEWAY PAVEMENT S Y 20 $80.00 $1,600.00 <br />2563.601 TRAFFIC CONTROL L S 1 $2,500.00 $2,500.00 <br />2573.530 STORM DRAIN INLET PROTECTION EACH 6 $200.00 $1,200.00 <br />2575.605 BLOWN COMPOST SEEDING S Y 20 $5.00 $100.00 <br />$60,000.00 <br />+10% CONTINGENCY $6,000.00 <br />SUBTOTAL CONSTRUCTION COST SCHEDULE E. ‐ MILL AND OVERLAY IMPROVEMENTS $66,000.00 <br />+25% INDIRECT COSTS $16,500.00 <br />GRAND TOTAL CONSTRUCTION COST SCHEDULE E. ‐ MILL AND OVERLAY IMPROVEMENTS $82,500.00 <br />TOTAL CONSTRUCTION COST SCHEDULE E. ‐ MILL AND OVERLAY IMPROVEMENTS <br />SCHEDULE E. ‐ MILL AND OVERLAY IMPROVEMENTS <br />OPINION OF PROBABLE COSTS <br />2018 STREET AND UTILITY IMPROVEMENT PROJECT <br />PROJECT NO. 010507‐000 <br />ST ANTHONY, MN <br />JULY 28, 2017 <br />55
The URL can be used to link to this page
Your browser does not support the video tag.