Laserfiche WebLink
St. Anthony 2040 Comprehensive Plan Chapter 7: Sanitary Sewer <br />153 <br /> <br />COST ESTIMATES AND FINANCING <br />TABLE 7-11 lists the capital improvements and the significant maintenance <br />and rehabilitation work planned for the City of St. Anthony’s sewer <br />system. <br />TABLE 7-11: CAPITAL IMPROVEMENTS <br />Year Improvement Estimated <br />Cost <br />2018 Foss Road Lift Station Pump Replacement $154,000 <br />2019 Harding Lift Station Pump Replacement $36,000 <br />2020 Lift Station SCADA System $40,000 <br />2024 Foss Road Lift Station Pump Rehab $10,000 <br />2026 Harding Lift Station Pump Rehab $5,000 <br />SUMMARY AND OUTCOMES <br />The analysis provided in this Comprehensive Sanitary Sewer Plan is <br />aimed to provide the City of St. Anthony and the Metropolitan Council <br />assistance in planning for wastewater collection and treatment. It is <br />anticipated that the design flows and criteria outlined will be used for <br />utility planning as development continues within the City. Tables and <br />figures can be utilized to create budget-level estimates and schematic <br />representations of infrastructure improvements, with specific sizing and <br />routing to be determined during the design phase.