Laserfiche WebLink
St. Anthony 2040 Comprehensive Plan Chapter 7: Sanitary Sewer <br />152 <br /> <br />TABLE 7-10: I/I REDUCTION ACTIVITIES <br />Year Description Cost <br />2016 Pipe televising, removal, replacement. $ 148,042.00 <br />2015 Pipe televising, removal, replacement. $ 263,805.22 <br />2014 Pipe televising, removal, replacement. $ <br />216,714.65 <br />2013 Pipe televising, removal, replacement. $ <br />124,008.57 <br />2012 Pipe installation (Emerald Park). $ 47,750.00 <br />2012 Pipe bursting, replacement (Macalester Drive). $ <br />118,485.25 <br />2012 Pipe televising, removal, replacement. $ 205,580.53 <br />2011 Pipe televising, removal, replacement. $ <br />160,236.37 <br />2010 Pipe televising, removal, replacement. $ <br />118,396.03 <br />2009 Pipe televising, removal, replacement. $ <br />178,772.54 <br />2008 Pipe televising, removal, replacement. $ <br />1,470,959.00 <br />2007 Pipe televising, removal, replacement. $ <br />525,671.10 <br />2006 Pipe televising, removal, replacement. $ <br />192,766.61 <br />2005 Pipe removal, bursting, replacement. $ 196,600.34 <br />2004 Pipe televising, removal, bursting, <br />replacement. <br />$ <br />171,491.80 <br />The City has planned and budgeted for additional sanitary sewer <br />improvements through 2025 as part of its Street & Utility Reconstruction <br />Program. The improvements planned for 2017 along Skycroft Drive and <br />Maplewood Drive will cost an estimated $327,785.00 and include pipe <br />televising, removal, and replacement. The City of St. Anthony will <br />continue to rehabilitate its sanitary sewer system in an effort to reduce I/I.