Laserfiche WebLink
www.pca.state.mn.us • 651-296-6300 • 800-657-3864 • TTY 651-282-5332 or 800-657-3864 • Available in alternative formats <br />wq-strm4-49a • 5/31/13 Page 13 of 18 <br /> a. Have you established written procedures for site plan reviews that you conduct prior to the start of <br />construction activity? <br /> Yes No <br /> b. Does the site plan review procedure include notification to owners and operators proposing <br />construction activity that they need to apply for and obtain coverage under the MPCA’s general <br />permit to Discharge Stormwater Associated with Construction Activity No. MN R100001? <br /> Yes No <br /> c. Does your program include written procedures for receipt and consideration of reports of <br />noncompliance or other stormwater related information on construction activity submitted by the <br />public to the permittee? <br /> Yes No <br /> d. Have you included written procedures for the following aspects of site inspections to determine <br />compliance with your regulatory mechanism(s): <br /> <br /> 1) Does your program include procedures for identifying priority sites for inspection? Yes No <br /> 2) Does your program identify a frequency at which you will conduct construction site <br />inspections? <br /> Yes No <br /> 3) Does your program identify the names of individual(s) or position titles of those responsible for <br />conducting construction site inspections? <br /> Yes No <br /> 4) Does your program include a checklist or other written means to document construction site <br />inspections when determining compliance? <br /> Yes No <br /> e. Does your program document and retain construction project name, location, total acreage to be <br />disturbed, and owner/operator information? <br /> Yes No <br /> f. Does your program document stormwater-related comments and/or supporting information used to <br />determine project approval or denial? <br /> Yes No <br /> g. Does your program retain construction site inspection checklists or other written materials used to <br />document site inspections? <br /> Yes No <br /> If you answered no to any of the above permit requirements, describe the tasks and corresponding schedules that will be <br />taken to assure that, within 12 months of the date permit coverage is extended, these permit requirements are met. <br />D.2.d.: City will develop written procedures for prioritizing site inspections as described in the Permit (Part III.D.4.d). <br />Procedures will be in place within 12 months following the date permit coverage is extended. <br />D.2.g.: City will develop written procedures for retaining documents of site ESC inspections as described in the Permit <br />(Part III.D.4.g). Procedures will be in place within 12 months following the date permit coverage is extended. <br />3. List the categories of BMPs that address your construction site stormwater runoff control program. Use the first <br />table for categories of BMPs that you have established and the second table for categories of BMPs that you plan <br />to implement over the course of the permit term. <br />Include the measurable goals with appropriate timeframes that each BMP category will be implemented and <br />completed. In addition, provide interim milestones and the frequency of action in which the permittee will implement <br />and/or maintain the BMPs. Refer to the EPA’s Measurable Goals Guidance for Phase II Small MS4s <br />(http://www.epa.gov/npdes/pubs/measurablegoals.pdf). If you have more than five categories, hit the tab key <br />after the last line to generate a new row. <br /> <br />Established BMP categories Measurable goals and timeframes <br />Ordinance or other Regulatory Mechanism <br />Review existing construction site erosion control ordinances, <br />and revise if found non-conforming to new NPDES Phase II <br />construction permit requirements. <br /> <br />The City will evaluate the pre-existing City Code, Chapter 153 <br />Stormwater Management and update as necessary to conform <br />to the MPCA CSW Permit that was approved in 2013. <br />Construction Site Implementation of Erosion and <br />Sediment Control BMP’s: Waste Controls for <br />Construction Site Operators <br />Construction site operators must conform to NPDES Phase II, <br />watershed district, and City ordinances pertaining to erosion, <br />sediment, and waste controls. <br /> <br />This BMP will be continued into the new permit term and will be <br />completed annually. <br />Procedure for Site Plan Review <br /> <br />Every applicant for a City permit to allow land disturbing <br />activities must submit a project specific stormwater management <br />plans (if applicable) and/or erosion control plan to the City for <br />approval. <br /> <br />This BMP will be continued into the new permit term and will be <br />completed annually. <br />Establishment of Procedures for the Receipt and Provide a phone number, website, and point of contact for the