Laserfiche WebLink
www.pca.state.mn.us • 651-296-6300 • 800-657-3864 • TTY 651-282-5332 or 800-657-3864 • Available in alternative formats <br />wq-strm4-49a • 5/31/13 Page 14 of 18 <br />Consideration of Reports of Stormwater <br />Noncompliance <br />public to report storm water pollution issues. <br /> <br />This BMP will be continued into the new permit term and will be <br />completed annually. <br />Establishment of Procedures for Site Inspections and <br />Enforcement <br />Continue to enforce the City’s erosion control and waste <br />disposal standards. Add additional procedures or requirements <br />as necessary. <br /> <br />This BMP will be continued into the new permit term and will be <br />completed annually. <br /> <br />BMP categories to be implemented Measurable goals and timeframes <br />Prioritize Inspections <br />The City will develop a process to determine the frequency for <br />inspecting high priority inspection sites (e.g., near sensitive <br />receiving waters, projects larger than 5 acres). <br />Documentation Procedures <br />Develop written procedures to track and archive all plan review <br />and inspection documents within 12 months following the date <br />permit coverage is extended. <br /> <br />4. Provide the name or the position title of the individual(s) who is responsible for implementing and/or coordinating this <br />MCM: <br />Public Works Director <br />E. MCM 5: Post-construction stormwater management <br />1. The Permit (Part III.D.5.) requires that, within 12 months of the date permit coverage is extended, existing permittees <br />shall revise their current program, as necessary, and continue to implement and enforce a post-construction stormwater <br />management program. Describe your current program: <br />The City has a post-construction stormwater management ordinance that references the Comprehensive Water <br />Resources Management Plan (CWMP). The CWMP that requires the utilization of BMPs for stormwater runoff from new <br />and redevelopment projects, as well as to ensure the maintenance and operation of the stormwater BMPs. <br />2. Have you established written procedures for site plan reviews that you will conduct prior to the start of <br />construction activity? <br /> Yes No <br />3. Answer yes or no to indicate whether you have the following listed procedures for documentation of <br />post-construction stormwater management according to the specifications of Permit (Part III.D.5.c.): <br /> a. Any supporting documentation that you use to determine compliance with the Permit (Part <br />III.D.5.a), including the project name, location, owner and operator of the construction activity, any <br />checklists used for conducting site plan reviews, and any calculations used to determine <br />compliance? <br /> Yes No <br /> b. All supporting documentation associated with mitigation projects that you authorize? Yes No <br /> c. Payments received and used in accordance with Permit (Part III.D.5.a.(4)(f))? Yes No <br /> d. All legal mechanisms drafted in accordance with the Permit (Part III.D.5.a.(5)), including date(s) of <br />the agreement(s) and names of all responsible parties involved? <br /> Yes No <br /> If you answered no to any of the above permit requirements, describe the steps that will be taken to assure that, within <br />12 months of the date permit coverage is extended, these permit requirements are met. <br />E.3., The City will develop written procedures for documention of post-construction stormwater management as <br />described in the Permit (Part III.D.5.c.). Procedures will be in place within 12 months following the date permit <br />coverage is extended. <br />4. List the categories of BMPs that address your post-construction stormwater management program. Use the first table <br />for categories of BMPs that you have established and the second table for categories of BMPs that you plan to <br />implement over the course of the permit term. <br />Include the measurable goals with appropriate timeframes that each BMP category will be implemented and <br />completed. In addition, provide interim milestones and the frequency of action in which the permittee will implement <br />and/or maintain the BMPs. Refer to the EPA’s Measurable Goals Guidance for Phase II Small MS4s <br />(http://www.epa.gov/npdes/pubs/measurablegoals.pdf). If you have more than five categories, hit the tab key after <br />the last line to generate a new row. <br /> <br />Established BMP categories Measurable goals and timeframes <br />Development and Implementation of Structural and/or <br />Non-Structural BMP’s <br />The City will evaluate all structural and non-structural BMP’s <br />during the plan review process for the potential of new and/or