My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION PACKET 01302018
StAnthony
>
City Council
>
City Council Work Session
>
2018
>
CC WORKSESSION PACKET 01302018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2018 12:35:19 PM
Creation date
1/22/2018 12:31:13 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RCWD Alternative Compliance Sequencing Report <br />City of St. Anthony Village PAGE 29 <br />WSB Project No. 1626-53 <br />Results shown on Table 7 indicate that the City can meet the RCWD’s water <br />quality/volume control requirements for all right of way within the City by using <br />equivalent TP reduction of the water quality BMPs outlined above. <br /> <br />B. Compliance Plan by Subwatershed <br />To better define the course of action that the City will use to meet the Alternative <br />Compliance Sequencing requirements, the proposed linear reconstruction projects <br />and existing / proposed water quality improvement projects have been grouped by <br />subwatershed. Each existing/proposed water quality improvement BMP has been <br />assigned to address requirements of one or more projects within the subwatershed. <br />This will allow the City to demonstrate compliance with RCWD Rules on future <br />projects. It is anticipated that each water quality BMP will be constructed prior to, <br />or within two years of the linear project(s) that will benefit from the BMP. See <br />Tables 8 and 9 below. <br /> <br />Table 8: Silver Lake Subwatershed Alternative Compliance Plan <br />Year Linear Project / BMP Project <br />Benefitted <br />Improvement <br />Project(s) <br />Equivalent Annual <br />Volume Reduction <br />(ft3) <br />Credit Debit PAST 2011 Street Improvements - 189,103 <br />2011 Street Filtration Basins 2011 31,095 - <br /> Subtotal 31,095 189,103 <br /> Subtotal Balance - 158,008 <br />FUTURE 2012 Street Improvements - 40,190 <br />2013 Street Improvements - 91,341 <br /> 2013 - <br />2015 37th Avenue In-line Treatment System 2011 <br />2012 <br />2013 <br />2024 <br />Future <br />421,560 - <br /> 2013 - <br />2015 Salo Ponds Alum Treatment 943,051 - <br />2024 Street Improvements - 153,453 <br />2015 Stinson Blvd In-line Treatment System Future 134,722 - <br /> Subtotal 1,499,333 284,984 <br /> Subtotal Balance 1,214,349 - <br />TOTAL 1,395,706 474,087 <br /> TOTAL BALANCE 921,619 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.