My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016 Public Works Department Annual Report
StAnthony
>
Administration
>
Annual Reports
>
Public Works Annual Reports
>
2016 Public Works Department Annual Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2018 10:22:25 AM
Creation date
2/7/2018 10:18:14 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2016 Annual Report • Public Works Department • St. Anthony Village, Minnesota <br /> <br /> <br /> <br />17 <br /> <br />HIGHWAY SAFETY IMPROVEMENT PROGRAM GRANT <br />The city received a Highway Safety Improvement Program (HSIP) grant to construct a sidewalk <br />and upgrade six traffic signals within the community. The construction of a sidewalk along the <br />south side of 37th Avenue between Highcrest Road and Stinson Boulevard has been a <br />community goal to provide safer access to Wilshire Park Elementary School; to provide <br />residents with an ability to get from residential areas safely to local restaurants, parks, and <br />commercial nodes; and to provide safer and easier access to Metro Transit bus stops. <br /> <br />Along with the construction of the sidewalk, the city is upgrading six traffic signals to provide <br />for safer pedestrian crossing and to be in conformance with the Americans with Disabilities Act. <br />This includes upgrading pedestrian ramps, providing countdown timers, providing audio <br />queues for the visually impaired and relocating push buttons to accessible locations. The <br />design and ROW work was undertaken in 2015 and construction is anticipated in 2017.
The URL can be used to link to this page
Your browser does not support the video tag.