February 20, 2018  <br />Page 6  <br /> <br />includes traditional at grade ponds and below grade bio‐filtration systems. Detailed comments have  <br />been submitted with the City Engineer’s memo.  <br />  <br />Utilities: Public sanitary sewer and watermain extensions and hydrants are proposed as part of this  <br />development. The infrastructure is proposed under private streets, with public easements over them.  <br />Detailed comments on the utilities have been submitted with the City Engineer’s memo.  <br />  <br />Phasing: After the final PUD approval, work will commence on the assisted senior living building as soon  <br />as weather conditions will allow. Construction is expected to take approximately 18 months to complete  <br />per building. As crews finish their particular subset of work, they will move to the independent senior  <br />living building and then to the market rate building. The Village is hopeful to commence work at the end  <br />of 2018 with an aggressive construction schedule to complete all three buildings by late 2020 or 2021.  <br />  <br />Park Dedication Fees: Park dedication is required on all new subdivisions in St. Anthony. The amount of  <br />land (or cash in‐lieu) will be determined at the time of final plat. All park dedication requests will need to  <br />be reviewed by the Park Commission (March 5th). More details will be needed to determine appropriate  <br />park dedication obligation and credit.  <br />  <br />Development Agreements/Contracts: A series of development agreements and contracts will be  <br />required for this project. These legal documents will be drafted and prepared at appropriate times  <br />during the final plat/final development plan stage.  <br />  <br />Other Agency/Department Requirements: In addition to city code requirements for the review and  <br />consideration of a Planned Unit Development preliminary development plan, re‐zoning and subdivision  <br />application, this re‐development is subject to many other jurisdictional requirements including the  <br />following:  <br />  <br />State Rules Governing Completion of an Environmental Assessment Worksheet (EAW). Due to its size  <br />(over 375 attached units), State Rule 4410 requires preparation of an EAW to evaluate and identify  <br />existing environmental conditions and identify the impacts of this proposed development with regard to  <br />land use, soils, fish/wildlife, historical property, water resources, sewer, water, and transportation  <br />infrastructure and any potential noise, odor, light, or visual impacts. This document has been completed  <br />and several recommendations listed in this staff report are a result of this study.  <br />  <br />Minnesota Pollution Control Agency. As part of the developer’s purchase of the property, Phase I and  <br />Phase II Environment Assessments were completed and identified several sources of contamination on  <br />the property, which will need to be properly handled and remediated through the process established  <br />by the Minnesota Pollution Control Agency. Additionally, sanitary extension and construction permits  <br />will also be needed. Copies of all required permits will be required to be submitted prior to final  <br />approval of the development.  <br />  <br />Minneapolis Park and Recreation Board. MPRB has submitted comments regarding the proposed  <br />development, outlining the process and permits required. The land under which Stinson Parkway is built  <br />is considered MPRB parkland, not right‐of‐way. Therefore, special review and provision must be made  <br />for any upgrades or impacts to Stinson Parkway, given its designation as parkland and the MPRB