My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 02262018
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2018
>
PL PACKET 02262018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 8:40:08 AM
Creation date
2/20/2018 3:22:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />You will also note that we have sought to balance the need for green space <br />and the need for adequate parking. The Village believes that between the <br />underground parking, the surface parking, and the street parking on the <br />internal street there is sufficient parking for all uses in the Property. But it <br />also recognizes that the demographics of each development and the <br />parking needs of that demographic can vary dramatically between <br />projects. To ensure that it has capacity if the reality of the Project proves <br />more surface parking is necessary, The Village has built a buffer known as <br />“proof of parking.” If The Village is correct and it has adequate parking, <br />precious green space will be preserved. But in the event that more <br />parking is needed, The Village has identified a location of 37 additional <br />stalls that would be constructed upon triggering events set out in the <br />master development agreement that will be entered into between the City <br />and The Village as part of any PUD approval. <br />Status of Bremer Property <br />Before turning to the specifics of the Applications, a clarification is in <br />order about the status of the Bremer Property. The Village had a fully <br />executed purchase agreement allowing it to acquire the Bremer Property <br />(the “Bremer PA”). The Bremer PA has expired. <br />Additionally, The Village had previously reached a contingent agreement <br />to eventually transfer the Bremer Property (and a portion of the Property) <br />to Aeon (the “Aeon PA”). But the contingencies in the Aeon PA were not <br />met, and the parties have agreed to cancel the Aeon PA. The Village never <br />intended to take ownership of the Bremer Property or close on the Bremer <br />PA. Instead, The Village expected to locate affordable housing on the <br />Bremer Property as part of a mixed-use building. Discussions continue <br />with Bremer while Bremer examines development options for the site. <br />Within the Applications, The Village looks to include the Bremer Property <br />in the redevelopment tax increment district to give the eventual developer <br />all available flexibility. <br />The Bremer Property is not included in the preliminary plat application. <br />The eventual Bremer developer will receive the redevelopment tax <br />increment designation and will have full control over the PUD process for <br />the Bremer Property directly with the City. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.