My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 04242018
StAnthony
>
City Council
>
City Council Packets
>
2018
>
CC PACKET 04242018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2018 10:12:09 AM
Creation date
4/19/2018 7:43:07 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Honorable Mayor, City Council and Staff <br />April 13, 2018 <br />Page 3 <br /> <br /> <br /> C:\Users\jmessner.WSBA\Desktop\LTR-hmcc-27th_Pahl_Traffic Study-041318 - CTR.docx <br />Task 4 – Traffic Forecasts <br /> <br />Future year traffic forecasts will be prepared for the area roadways taking into account the City’s <br />comprehensive plan and anticipated development in the area. These forecasts will be used to identify <br />expected traffic growth within the neighborhood. <br /> <br />Task 5 – Identification of Traffic Calming Alternatives and Evaluation <br /> <br />Based on the existing conditions issues and needs, traffic calming alternatives will be identified. These could <br />include but are not limited to: <br /> <br />• Closing / restricting street access <br />• Speed tables, humps or bumps <br />• Signing and/or pavement markings <br /> <br />Each of the traffic calming alternatives will be evaluated and compared to the existing condition. An <br />alternative matrix will be prepared to document the comparison of the following: <br /> <br />• Traffic volumes <br />• Vehicle speeds <br />• Cut‐through traffic <br />• Pedestrian Safety <br />• Emergency vehicle access <br />• School bus access <br /> <br />Task 6 – Recommendation/Report Preparation <br /> <br />A draft and final report documenting the data collection, study methodology, conclusions and <br />recommendations will be prepared. This report will be prepared and signed by a WSB registered Professional <br />Engineer (PE) and registered Professional Traffic Operation Engineer (PTOE) and submitted to the City for <br />review and comment. It is assumed that the City will provide one set of review comments. Following receipt <br />of comments, a final report and recommendation will be prepared and submitted for final approval. <br /> <br />Task 7 – Agency Coordination/Meetings <br /> <br />WSB will coordinate the preparation of the traffic study with the affected residents, City Staff and other <br />impacted agencies by meeting in person, phone and email correspondence. In addition, this task will include <br />three meetings; one with City Staff and residents to review the data collection and identify potential traffic <br />calming alternatives; one with City Staff and residents to present the study methodologies and findings, and; <br />one with City Council to present the final report and recommendations. If additional meetings are required, <br />WSB would bill those costs at our standard hourly rates. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />47
The URL can be used to link to this page
Your browser does not support the video tag.