My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 05222018
StAnthony
>
City Council
>
City Council Packets
>
2018
>
CC PACKET 05222018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2018 9:14:17 AM
Creation date
5/18/2018 11:21:59 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
St. Anthony 2040 Comprehensive Plan Chapter 7: Sanitary Sewer <br />138 <br /> <br />TABLE 7-6: LIFT STATION CAPACITY ANALYSIS <br />Lift <br />Station <br />Pumping <br />Capacity <br />(gpm) <br />Location Existing Max <br />Flow (gpm) <br />2040 Max <br />Flow (gpm) <br />Remaining <br />Capacity (gpm) <br />3 2,000 Foss Road 1,830 1,970 30 <br />4 300 Harding Street <br />NE 240 240 60 <br />5 5 Silver Point Park 5 5 - <br /> <br />A trunk sewer capacity analysis was conducted in order to determine <br />whether the existing sewer service trunk lines would be sufficiently sized <br />to handle the increased wastewater flows due to development by 2040. <br />The capacities of the major sewer trunk lines in St Anthony were <br />calculated and compared to the 2040 maximum flows within each meter <br />region. All four-meter regions (M055, M055A, M104, and unmetered <br />M131) have trunk sewer lines with sufficient capacity to serve the 2040 <br />maximum flows. Therefore, there is currently no anticipated need for trunk <br />upsizing in St Anthony, given the current 2040 development plan. A <br />summary of this analysis is provided in TABLE 7-7 below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.