Laserfiche WebLink
St. Anthony 2040 Comprehensive Plan Chapter 7: Sanitary Sewer <br />143 <br /> <br />TABLE 7-10: I/I REDUCTION ACTIVITIES <br />Year Description Cost <br />2016 Pipe televising, removal, replacement. $148,042.00 <br />2015 Pipe televising, removal, replacement. $263,805.22 <br />2014 Pipe televising, removal, replacement. $216,714.65 <br />2013 Pipe televising, removal, replacement. $124,008.57 <br />2012 Pipe installation (Emerald Park). $47,750.00 <br />2012 Pipe bursting, replacement (Macalester <br />Drive). <br />$118,485.25 <br />2012 Pipe televising, removal, replacement. $205,580.53 <br />2011 Pipe televising, removal, replacement. $160,236.37 <br />2010 Pipe televising, removal, replacement. $118,396.03 <br />2009 Pipe televising, removal, replacement. $178,772.54 <br />2008 Pipe televising, removal, replacement. $1,470,959.00 <br />2007 Pipe televising, removal, replacement. $525,671.10 <br />2006 Pipe televising, removal, replacement. $192,766.61 <br />2005 Pipe removal, bursting, replacement. $196,600.34 <br />2004 Pipe televising, removal, bursting, <br />replacement. <br />$171,491.80 <br />The City has planned and budgeted for additional sanitary sewer <br />improvements through 2025 as part of its Street & Utility Reconstruction <br />Program. The improvements completed during 2017 along Skycroft Drive <br />and Maplewood Drive will cost an estimated $327,785.00 and include <br />pipe televising, removal, and replacement. The City of St. Anthony will <br />continue to rehabilitate its sanitary sewer system in an effort to reduce I/I.