My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 05222018
StAnthony
>
City Council
>
City Council Packets
>
2018
>
CC PACKET 05222018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2018 9:14:17 AM
Creation date
5/18/2018 11:21:59 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
St. Anthony 2040 Comprehensive Plan Chapter 7: Sanitary Sewer <br />144 <br /> <br />COST ESTIMATES AND FINANCING <br />TABLE 7-11 lists the capital improvements and the significant maintenance <br />and rehabilitation work planned for the City of St. Anthony’s sewer system. <br />TABLE 7-11: CAPITAL IMPROVEMENTS <br />Year Improvement Estimated <br />Cost <br />2018 Foss Road Lift Station Pump Replacement $154,000 <br />2019 Harding Lift Station Pump Replacement $36,000 <br />2020 Lift Station SCADA System $40,000 <br />2024 Foss Road Lift Station Pump Rehab $10,000 <br />2026 Harding Lift Station Pump Rehab $5,000 <br />SUMMARY AND OUTCOMES <br />The analysis provided in this Comprehensive Sanitary Sewer Plan is aimed <br />to provide the City of St. Anthony and the Metropolitan Council assistance <br />in planning for wastewater collection and treatment. It is anticipated that <br />the design flows and criteria outlined will be used for utility planning as <br />development continues within the City. Tables and figures can be utilized <br />to create budget-level estimates and schematic representations of <br />infrastructure improvements, with specific sizing and routing to be <br />determined during the design phase.
The URL can be used to link to this page
Your browser does not support the video tag.