Laserfiche WebLink
St. Anthony 2040 Comprehensive Plan Chapter 7: Sanitary Sewer <br />144 <br /> <br />COST ESTIMATES AND FINANCING <br />TABLE 7-11 lists the capital improvements and the significant maintenance <br />and rehabilitation work planned for the City of St. Anthony’s sewer system. <br />TABLE 7-11: CAPITAL IMPROVEMENTS <br />Year Improvement Estimated <br />Cost <br />2018 Foss Road Lift Station Pump Replacement $154,000 <br />2019 Harding Lift Station Pump Replacement $36,000 <br />2020 Lift Station SCADA System $40,000 <br />2024 Foss Road Lift Station Pump Rehab $10,000 <br />2026 Harding Lift Station Pump Rehab $5,000 <br />SUMMARY AND OUTCOMES <br />The analysis provided in this Comprehensive Sanitary Sewer Plan is aimed <br />to provide the City of St. Anthony and the Metropolitan Council assistance <br />in planning for wastewater collection and treatment. It is anticipated that <br />the design flows and criteria outlined will be used for utility planning as <br />development continues within the City. Tables and figures can be utilized <br />to create budget-level estimates and schematic representations of <br />infrastructure improvements, with specific sizing and routing to be <br />determined during the design phase.