Laserfiche WebLink
New Brighton/St. Anthony Basic Water Management Project – Phase 1 Rice Creek Watershed District <br />5555-221 Revised Final 26 June 10, 2014 <br />2011 <br />Report ID Project Name Problem Area <br />Public <br />Drainage <br />System <br />Watershed Project Type Potential Benefits <br />Water <br />Quality <br />Benefit <br />Potential Negative Impacts <br />-2014 Pavement Management Program- <br />Drainage Improvements Sandcastle Park Area Yes RCD 5 <br />Detention, Flood <br />Proofing, <br />Conveyance <br />Modification <br />Lower flood elevations, reduce flood <br />damage to property, re-grade and lower <br />emergency overflow swale <br />Yes <br />- <br />Twin Lakes I-35W Interchange Ramp <br />Terminal and I-35W/Cleveland Avenue <br />Intersection Improvements <br />Cleveland Avenue Yes RCD 5 <br />Detention, <br />Conveyance <br />Modification <br />Lower flood elevations along Cleveland <br />Ave.Yes <br />- Railroad Open Channel Maintenance Railroad Ditch from TH 36 to <br />County Road D Yes RCD 5 Conveyance <br />Modification <br />Restore ditch to original design/capacity, <br />reduce flood elevations in ditch/potential <br />for property damage <br />No Increase downstream peak <br />flows and elevations <br />- St. Croix Lift Station Improvements I35W – St. Croix Street Yes RCD 5 Conveyance <br />Modification Localized lowering of flood elevations No Increase downstream peak <br />flows and elevations <br />- Pike Lake Channel Modification TBD Yes RCD 2 Conveyance <br />Modification TBD TBD TBD <br />86