My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09112018
StAnthony
>
City Council
>
City Council Packets
>
2018
>
CC PACKET 09112018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2018 8:15:02 AM
Creation date
9/6/2018 3:30:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />2020 STREET AND UTILITY IMPROVEMENT PROJECT <br />FEASIBILITY REPORT <br />CITY OF ST. ANTHONY VILLAGE <br />WSB PROJECT NO. R-011648-000 PAGE 2 <br />2. INTRODUCTION <br />2.1 Authorization <br />On May 22, 2018, the St. Anthony Village City Council authorized the preparation of an <br />engineering Feasibility Report for the 2020 Street and Utility Improvement Project. This <br />project was authorized under City of St. Anthony Village Resolution 18-045. <br />2.2 Scope <br />The City has directed staff to investigate two options for improvements proposed in 2020 <br />to review budget impacts to the City’s overall Capital Improvement Plan (CIP). The <br />following options were investigated: <br /> <br />Street and Utility Improvements Option 1: <br />• Skycroft Drive from 33rd Avenue NE to 32nd Avenue NE <br />• Croft Drive from 33rd Avenue NE to 32nd Avenue NE <br />• 32nd Avenue NE from Rankin Road to Croft Drive <br />• Croft Drive from 32nd Avenue NE to 31st Avenue NE <br /> <br />Street and Utility Improvements Option 2: <br />• 32nd Avenue NE from Rankin Road to Croft Drive <br />• Croft Drive from 32nd Avenue NE to 31st Avenue NE <br /> <br />Proposed improvements include road reconstruction complete with bituminous paving <br />and concrete curb and gutter, watermain and sanitary sewer replacement, and the <br />extension of new storm sewer and installation of additional catch basins to improve area <br />drainage. <br />2.3 Data Available <br />Information and materials used in the preparation of this report include the following: <br />• City of St. Anthony Village Record Drawings <br />• City of St. Anthony Village Topographic Maps <br />• Subsurface Exploration <br />• Field observations of area <br /> <br />142
The URL can be used to link to this page
Your browser does not support the video tag.