My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09112018
StAnthony
>
City Council
>
City Council Packets
>
2018
>
CC PACKET 09112018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2018 8:15:02 AM
Creation date
9/6/2018 3:30:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
No.Mat. No.Item Units Estimated <br />Unit Price <br />Estimated <br />Quantity <br />Estimated <br />Cost <br />SCHEDULE C - WATER SYSTEM IMPROVEMENTS <br />76 2104.502 REMOVE GATE VALVE & BOX EACH $200.00 8 $1,600.00 <br />77 2104.503 REMOVE WATER MAIN L F $5.00 2,500 $12,500.00 <br />78 2104.509 REMOVE WATER SERVICE AND CURB BOX EACH $100.00 48 $4,800.00 <br />79 2104.509 REMOVE HYDRANT AND VALVE EACH $350.00 3 $1,050.00 <br />80 2451.507 COARSE AGGREGATE BEDDING (LV)C Y $38.00 200 $7,600.00 <br />81 2504.601 TEMPORARY WATER SERVICE L S $20,000.00 1 $20,000.00 <br />82 2504.602 CONNECT TO EXISTING WATER SERVICE EACH $250.00 48 $12,000.00 <br />83 2504.602 CONNECT TO EXISTING WATER MAIN EACH $2,000.00 5 $10,000.00 <br />84 2504.602 1" CORPORATION STOP EACH $250.00 48 $12,000.00 <br />85 2504.602 8" GATE VALVE AND BOX EACH $2,200.00 8 $17,600.00 <br />86 2504.602 1" CURB STOP & BOX EACH $300.00 48 $14,400.00 <br />87 2504.602 HYDRANT ASSEMBLY EACH $5,500.00 8 $44,000.00 <br />88 2504.603 1" TYPE K COPPER PIPE L F $32.00 1,520 $48,640.00 <br />89 2504.603 6" WATER MAIN-DUCT IRON CL 52 W/ POLY WRAP L F $48.00 120 $5,760.00 <br />90 2504.603 8" WATER MAIN-DUCT IRON CL 52 W/ POLY WRAP L F $52.00 2,500 $130,000.00 <br />91 2504.604 4" POLYSTYRENE INSULATION S Y $45.00 200 $9,000.00 <br />92 2504.608 DUCTILE IRON FITTINGS POUND $5.00 1,100 $5,500.00 <br />$356,450.00 <br />$35,645.00 <br />$392,095.00 <br />$98,023.75 <br />$490,118.75TOTAL SCHEDULE C - WATER SYSTEM IMPROVEMENTS <br />OPINION OF PROBABLE COSTS <br />2020 STREET AND UTILITY IMPROVEMENT PROJECT <br />PROJECT NO. R-011648-000 <br />ST ANTHONY, MN <br />AUGUST 29, 2018 <br />OPTION 1 - 32ND AVENUE, CROFT DRIVE, AND SKYCROFT DRIVE <br />SUBTOTAL SCHEDULE C - WATER SYSTEM IMPROVEMENTS <br />+ 10% CONTINGENCIES <br />SUBTOTAL SCHEDULE C - WATER SYSTEM IMPROVEMENTS <br />+ 25% ADMINISTRATIVE, LEGAL, ETC. <br />167
The URL can be used to link to this page
Your browser does not support the video tag.