Laserfiche WebLink
No.Mat. No.Item Units Estimated <br />Unit Price <br />Estimated <br />Quantity <br />Estimated <br />Cost <br />SCHEDULE D - DRAINAGE IMPROVEMENTS <br />93 2104.502 REMOVE DRAINAGE STRUCTURE EACH $500.00 3 $1,500.00 <br />94 2104.503 REMOVE SEWER PIPE (STORM)L F $10.00 200 $2,000.00 <br />95 2451.507 COARSE AGGREGATE BEDDING (LV)C Y $40.00 200 $8,000.00 <br />96 2503.503 15" RC PIPE SEWER DESIGN 3006 CLASS V L F $44.00 1,100 $48,400.00 <br />97 2503.503 18" RC PIPE SEWER DESIGN 3006 CLASS V L F $52.00 900 $46,800.00 <br />98 2503.602 CONNECT TO EXISTING STORM SEWER EACH $1,200.00 1 $1,200.00 <br />99 2506.502 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1 EACH $2,200.00 4 $8,800.00 <br />100 2506.502 CASTING ASSEMBLY (STORM)EACH $600.00 9 $5,400.00 <br />101 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 L F $450.00 60 $27,000.00 <br />$149,100.00 <br />$14,910.00 <br />$164,010.00 <br />$41,002.50 <br />$205,012.50TOTAL SCHEDULE D - DRAINAGE IMPROVEMENTS <br />OPINION OF PROBABLE COSTS <br />2020 STREET AND UTILITY IMPROVEMENT PROJECT <br />PROJECT NO. R-011648-000 <br />ST ANTHONY, MN <br />AUGUST 29, 2018 <br />OPTION 1 - 32ND AVENUE, CROFT DRIVE, AND SKYCROFT DRIVE <br />SUBTOTAL SCHEDULE D - DRAINAGE IMPROVEMENTS <br />+ 10% CONTINGENCIES <br />SUBTOTAL SCHEDULE D - DRAINAGE IMPROVEMENTS <br />+ 25% ADMINISTRATIVE, LEGAL, ETC. <br />168