My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09252018
StAnthony
>
City Council
>
City Council Packets
>
2018
>
CC PACKET 09252018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2018 8:30:56 AM
Creation date
9/21/2018 10:24:39 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Regular Meeting Minutes <br />September 11, 2018 <br />Page 7 <br /> <br /> <br />Infrastructure improvements proposed to be completed in 2019 include: 1 <br /> Flood improvements on Silver Lake Road from approximately 250 feet south of Silver 2 <br />Lane to approximately 600 feet north of Silver Lane. Cooperative project with Ramsey 3 <br />County, Rice Creek Watershed Management Organization and Minnesota Department of 4 <br />Natural Resources. 5 <br /> County Road C Improvements – cooperative project with Ramsey County, Hennepin 6 <br />County and Mississippi Watershed Management Organization. 7 <br />Bituminous trail improvements 8 <br />Concrete sidewalk improvements 9 <br />Watermain, sanitary sewer, and storm sewer improvements 10 <br />Industrial Park drainage and flood improvements 11 <br /> Flashing Yellow Left Turn Signal improvements at the intersection of Silver Lake Road 12 <br />and 33rd Avenue NE. 13 <br />Infrastructure improvements proposed to be completed in 2020 include: 14 <br /> Street and Utility Improvements Option 1: 15 <br />Skycroft Drive from 33rd Avenue NE to 32nd Avenue NE 16 <br />Croft Drive from 33rd Avenue NE to 32nd Avenue NE 17 <br />32nd Avenue NE from Rankin Road to Croft Drive 18 <br />Croft Drive from 32nd Avenue NE to 31st Avenue NE 19 <br /> Street and Utility Improvements Option 2: 20 <br />32nd Avenue NE from Rankin Road to Croft Drive 21 <br />Croft Drive from 32nd Avenue NE to 31st Avenue NE 22 <br /> 23 <br />Alternate improvements for City Council consideration in either 2019 or 2020 include the 24 <br />following: 25 <br /> County Road C Improvements – cooperative project with Ramsey County and Hennepin 26 <br />County 27 <br />Bituminous trail extension through the cemetery from County Road C (29th Avenue NE) 28 <br />to the south existing bituminous trail. 29 <br />Highway 88 turn lane improvements. 30 <br /> Bituminous mill and overlay improvements along the following streets: 31 <br />Silver Lane from Stinson Boulevard to Silver Lake Road. 32 <br />Silver Lake Terrace from Silver Lane to the north cul-de-sac. 33 <br /> 34 <br />Mr. Hubmer reviewed Council is requested to consider a resolution accepting the feasibility 35 <br />report and authorizing preparation of final plans and specifications for the 2019 improvements. 36 <br /> 37 <br />Mr. Hubmer reviewed the Feasibility Report in detail noting the Remaining Reconstruction 38 <br />Projects, 2019 Street and Utility Improvement Projects, 2020 Street and Utility Improvement 39 <br />Projects, the 2020 Project Costs and Funding, and 2019 Project Schedule. 40 <br /> 41 <br />It was noted residents are encouraged to sign up to receive weekly email updates and 42 <br />notifications regarding the 2019 Street and Utility Improvement Project by visiting the project 43 <br />webpage located under the “Projects” tab on the City’s website at https://www.savmn.com. 44 <br /> 45 <br />11
The URL can be used to link to this page
Your browser does not support the video tag.