My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION PACKET 10012018
StAnthony
>
City Council
>
City Council Work Session
>
2018
>
CC WORKSESSION PACKET 10012018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2018 10:54:44 AM
Creation date
9/27/2018 10:53:38 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o 2017 Bond proceeds funded the 2018 Fire truck purchase. Current plan assumes that <br />subsequent fire engine will also use bond financing. The related debt service is included in the <br />capital plan as a line item cost. <br />o Windows 7 end of life in 2019 required replacement of majority of City desktops and laptops in <br />2018. <br />o Replacement schedule for Dump Trucks has been revised to retain a fleet of four trucks. The <br />City’s snow removal process was reviewed. This review concluded that to continue to provide <br />timely snow removal a fleet a four trucks was considered necessary. <br />Parks Improvement Fund <br />o Central Park splash pad water reuse assessment was completed in 2017. <br /> Upon Councils’ review the re‐use project was add to the City’s 2018 Improvement plan. <br /> The Utility Infrastructure Fund will absorb this project cost as the result will mean less <br />treatment costs for the City’s water fund. Profits of the water fund are earmarked to <br />flow to the Utility Infrastructure Fund. <br />o Placeholders below were added based on preliminary reviews by Parks Commission and <br />Staff. <br /> Splash Pad shade structures and seating. <br /> Tennis Courts resurfacing. <br /> Replacing hockey rink at Silver Point Park. <br /> <br />Utilities Infrastructure Fund <br />o Restoration of Well 5 was completed 2018. <br />o Dump Truck scheduled for replacement in 2018 was completed. <br />o Fiber infrastructure was extended to the Foss and Harding lift stations and Well no. 5. The City <br />was able to compete this earlier than planned due to the elimination of the $180,000 connection <br />cost to Roseville. <br />o Funding of the Central Park splash pad water re‐use was added for 2018‐2019, per comment <br />above. <br /> <br />Street Improvement and Debt Service Plan <br />o Plan reflects the 2019/2020 street improvement schedule. <br />o Plan has current projections for future bond interest rates. <br />Stormwater Fund <br />o Mirror Lake Project dredging project was completion in 2018. <br /> Additional improvement to reduce erosion was included with funding 50% coming from the <br />Rice Creek Watershed District (RCWS). <br /> RCWS required that stormwater pipe be re‐routed to Mirror Lake as part of the 2018 Street <br />project. The cost for redirecting this stormwater will be funded 50% by RCWS. <br />o Silver Lake Road Flood Mitigation project is planned for 2019. <br /> Funding sources include the DNR – $350,000, Ramsey County ‐$100,000 and RCWS ‐ <br />$50,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.