o 2017 Bond proceeds funded the 2018 Fire truck purchase. Current plan assumes that  <br />subsequent fire engine will also use bond financing. The related debt service is included in the  <br />capital plan as a line item cost.  <br />o Windows 7 end of life in 2019 required replacement of majority of City desktops and laptops in  <br />2018.  <br />o Replacement schedule for Dump Trucks has been revised to retain a fleet of four trucks. The  <br />City’s snow removal process was reviewed. This review concluded that to continue to provide  <br />timely snow removal a fleet a four trucks was considered necessary.  <br />Parks Improvement Fund  <br />o Central Park splash pad water reuse assessment was completed in 2017.   <br /> Upon Councils’ review the re‐use project was add to the City’s 2018 Improvement plan.  <br /> The Utility Infrastructure Fund will absorb this project cost as the result will mean less  <br />treatment costs for the City’s water fund. Profits of the water fund are earmarked to  <br />flow to the Utility Infrastructure Fund.   <br />o Placeholders below were added based on preliminary reviews by Parks Commission and  <br />Staff.   <br /> Splash Pad shade structures and seating.  <br /> Tennis Courts resurfacing.  <br /> Replacing hockey rink at Silver Point Park.  <br />  <br />Utilities Infrastructure Fund   <br />o Restoration of Well 5 was completed 2018.   <br />o Dump Truck scheduled for replacement in 2018 was completed.  <br />o Fiber infrastructure was extended to the Foss and Harding lift stations and Well no. 5. The City  <br />was able to compete this earlier than planned due to the elimination of the $180,000 connection  <br />cost to Roseville.  <br />o Funding of the Central Park splash pad water re‐use was added for 2018‐2019, per comment  <br />above.   <br />  <br />Street Improvement and Debt Service Plan  <br />o Plan reflects the 2019/2020 street improvement schedule.  <br />o Plan has current projections for future bond interest rates.  <br />Stormwater Fund   <br />o Mirror Lake Project dredging project was completion in 2018.  <br /> Additional improvement to reduce erosion was included with funding 50% coming from the  <br />Rice Creek Watershed District (RCWS).  <br /> RCWS required that stormwater pipe be re‐routed to Mirror Lake as part of the 2018 Street  <br />project. The cost for redirecting this stormwater will be funded 50% by RCWS.  <br />o Silver Lake Road Flood Mitigation project is planned for 2019.  <br /> Funding sources include the DNR – $350,000, Ramsey County ‐$100,000 and RCWS ‐ <br />$50,000.  <br />