My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION PACKET 01292019
StAnthony
>
City Council
>
City Council Work Session
>
2019
>
CC WORKSESSION PACKET 01292019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2019 2:49:37 PM
Creation date
1/23/2019 2:48:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION <br />EAST OF THE RIVER PARK MASTER PLAN <br />OPERATIONS AND <br />MAINTENANCE <br />TRAIL PLANNING PROCESS <br />In addition to being integrated into the park planning <br />processes for ERPMP, the Grand Rounds Missing Link has <br />received additional input through a Regional Trails Workgroup <br />as well as the Technical Advisory Committee. Building off <br />the 2009 plan, MPRB has focused on strong interagency <br />coordination and community engagement as part of this <br />process. <br />The Regional Trail Work Group formed out of the East of the <br />River Park Master Plan Community Advisory Committee. <br />They met four times since March 2018, and all meetings were <br />open to the public. The workgroup was largely composed <br />of residents from neighborhoods along the Grand Rounds <br />Missing Link potential route. The workgroup has offered <br />ongoing insight and received staff updates on the process of <br />the Grand Rounds Missing Link interagency coordination. <br />The workgroup focused discussions around GRML route <br />options and a set of trail planning considerations were <br />developed out of the meetings that were approved by the East <br />of the River Community Advisory Committee in October, 2018. <br />The trail planning considerations will guide the route and <br />design of the Grand Rounds Missing Link. <br />The GRML Route Considerations are: <br />The workgroup and CAC also recommend that as it is <br />completed, the regional trail should be called Bridal Veil <br />Regional Trail as it will no longer be a missing link of the Grand <br />Rounds. <br />• Feasible <br />• A vision founded on interagency coordination <br />• MPRB Parkway typology whenever possible <br />• Increase park space and regional trail access <br />in underserved areas of Minneapolis <br />• Connect the river to St. Anthony Parkway <br />• Consider importance of industry to the city <br />STINSON PARKWAY <br />Although outside of the scope of the neighborhood parks <br />and the Grand Rounds Missing Link, Stinson Parkway is a <br />key connection between Ridgway and St. Anthony Parkway. <br />It has several garden areas maintained by the Stinson <br />Parkway Conservancy which offer visual interest and small <br />opportunities for gathering along the route. There is interest <br />by the community in pursuing improved bike facilities along <br />the parkway. On-street bike lanes are one option that the <br />community has expressed some interest in but also with the <br />acknowledgement that increasing development and density in <br />St. Anthony may bring higher traffic volumes to the parkway. <br />A bike trail was considered in the median, but the initial <br />potential for bike/auto conflict is high. <br />• Mitigate environmental justice challenges in <br />industrial areas and corridors near freeways <br />• Be an asset to the neighborhoods though which it passes <br />• Be a safe route for all users* <br />*This consideration was a staff addition to the route <br />considerations after the final CAC approval. <br />MAP LEGEND <br />Alternative Route 1: Elevated Crossing <br />Preferred Route: Elevated Crossing <br />Alternative Route 2: Elevated Crossing <br />ALTERNATIVE ROUTESPREFERRED ROUTE <br />Railroad Crossing <br />Sub-Option <br />ALTERNATE ROUTE 2: <br />Bike + Pedestrian + Automobile Access <br />Bike + Pedestrian + Automobile Access <br />Bike + Pedestrian Access Only <br />Bike + Pedestrian + Automobile Access <br />Bike + Pedestrian Access Only <br />Hennepin <br />Uni <br />v <br />e <br />r <br />s <br />i <br />t <br />y <br />35-W <br />Como IndustrialS <br />t <br />. <br /> An <br />th <br />on <br />y <br /> P <br />a <br />r <br />kw <br />a <br />y <br />Parkway to the River <br />At Grade Crossing <br />Raised Crossing <br />Trail Crosses River <br />Downtown Minneapolis <br />Gross GolfCourse <br />FIGURE 19 | PREFERRED AND ALTERNATIVE <br />GRML ROUTES <br />255
The URL can be used to link to this page
Your browser does not support the video tag.