Laserfiche WebLink
PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION <br />EAST OF THE RIVER PARK MASTER PLAN <br />OPERATIONS AND <br />MAINTENANCE <br />RIVER TO GREEN 4TH: <br /> In both the preferred and the alternate concepts, the <br />regional trail crosses from East River Road and takes 27th <br />Ave SE up toward University Avenue. This route passes by the <br />proposed Luxton Park addition which would be an important <br />connection to the neighborhood park network along the new <br />route (Section A.) The route crosses University Avenue and <br />proceeds to Green 4th, a newly improved street that includes <br />ecological and traffic calming features (Section B.) <br />PROPOSED <br />EXISTING <br />SECTION A: 27th Ave SE and Luxton Park (60’ Existing ROW) <br />6’ <br />5’5’5’5’ <br />8’ <br />8’12’12’ <br />10’10’5’10’4’6’ <br />BOULE- <br />VARD <br />BOULE- <br />VARDSIDEWALK SIDEWALKLANE <br />LANE LANE <br />PARKING LANE TRAIL <br />BIKE BIKE <br />CL <br />CL <br />SIDEWALK SIDEWALKPARKINGPARKING <br />SCALE: 1/8”=1’ <br />0 8’6’2’4’ <br />SECTION A: 27TH AVE SE AND LUXTON PARK (60’ EXISTING ROW) <br />PROPOSED <br />EXISTING <br />SECTION KEY <br />A <br />27TH AVE SEUNI <br />V <br />E <br />R <br />S <br />I <br />T <br />Y <br /> <br />A <br />V <br />E <br /> <br />S <br />E <br />264