My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION PACKET 01292019
StAnthony
>
City Council
>
City Council Work Session
>
2019
>
CC WORKSESSION PACKET 01292019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2019 2:49:37 PM
Creation date
1/23/2019 2:48:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION <br />EAST OF THE RIVER PARK MASTER PLAN <br />OPERATIONS AND <br />MAINTENANCE <br />INTERSECTION CONSIDERATIONS ALONG <br />THE ROUTE SEGMENT: <br />27th Avenue Southeast and East River Parkway: <br />MPRB, along with agency partners, considers the <br />intersection at 27th Avenue SE, East River Parkway, and <br />Franklin Avenue a crucial confluence of the parkway <br />and regional trail system. While Franklin Ave is owned <br />by the City of Minneapolis east of the Franklin Bridge, <br />27th Avenue Southeast is a Hennepin County road <br />(CSAH 5), and East River Road and Caleb Dorr Triangle <br />by MPRB, the intersection is a complex web of property <br />ownership and multimodal movement. The County <br />completed a study in 2010 that highlighted several <br />opportunities for improvements to the intersection that <br />MPRB is in support of exploring in collaboration with <br />the County and City. MPRB is open to a wide variety of <br />intersection improvements, that balance all modes of <br />transportation, including but not limited to: <br />• A one-lane round about that prioritizes <br />bike and pedestrian safety <br />• Raised crossings for bikes and pedestrians <br />• Realignment of streets at the intersection to create <br />a four way intersection to replace the five way <br />intersection that may include the integration of <br />MPRB owned land or ROW into the solution <br />• Solutions yet to be determined <br />PROPOSED <br />EXISTING <br />SECTION B: 27th Ave SE, South of SE 4th St, North of University (80’ Existing ROW) <br />SCALE: 1/8”=1’ <br />0 8’6’2’4’ <br />8’6’ <br />6’6’6’6’ <br />8’ <br />8’8’ <br />8’10’ <br />12’12’ <br />10’14’6’6’4’ <br />BOULE- <br />VARD <br />BOULE- <br />VARD <br />BOULE- <br />VARD <br />BOULE- <br />VARD <br />BOULE- <br />VARDSIDEWALK <br />SIDEWALK SIDEWALK <br />SIDEWALKLANE <br />LANE LANE <br />PARKING <br />PARKING PARKING <br />PARKINGLANE TRAIL <br />CL <br />CL <br />PROPOSED <br />EXISTING <br />SECTION B: 27th Ave SE, South of SE 4th St, North of University (80’ Existing ROW) <br />SCALE: 1/8”=1’ <br />0 8’6’2’4’ <br />8’6’ <br />6’6’6’6’ <br />8’ <br />8’8’ <br />8’10’ <br />12’12’ <br />10’14’6’6’4’ <br />BOULE- <br />VARD <br />BOULE- <br />VARD <br />BOULE- <br />VARD <br />BOULE- <br />VARD <br />BOULE- <br />VARDSIDEWALK <br />SIDEWALK SIDEWALK <br />SIDEWALKLANE <br />LANE LANE <br />PARKING <br />PARKING PARKING <br />PARKINGLANE TRAIL <br />CL <br />CL <br />SECTION B: 27TH AVE SE, SOUTH OF SE 4TH ST, NORTH OF UNIVERSITY (80’ EXISTING ROW) <br />PROPOSED <br />EXISTING <br />SECTION KEY <br />B SE 4 <br />T <br />H <br /> <br />S <br />T <br />UNI <br />V <br />E <br />R <br />S <br />I <br />T <br />Y <br /> <br />A <br />V <br />E <br /> <br />S <br />E <br />265
The URL can be used to link to this page
Your browser does not support the video tag.