My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION PACKET 01292019
StAnthony
>
City Council
>
City Council Work Session
>
2019
>
CC WORKSESSION PACKET 01292019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2019 2:49:37 PM
Creation date
1/23/2019 2:48:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION <br />EAST OF THE RIVER PARK MASTER PLAN <br />OPERATIONS AND <br />MAINTENANCE <br />SECTION H: 27th Ave SE, North of Como Ave SE (60’ Existing ROW) <br />SCALE: 1/8”=1’ <br />0 8’6’2’4’ <br />6’ <br />6’6’ <br />4’ <br />6’6’ <br />4’5’5’ <br />8’8’ <br />8’8’10’10’ <br />BOULE- <br />VARD <br />BOULE- <br />VARD <br />BOULE- <br />VARD <br />PEDBIKE <br />TRAIL: SEPARATE USE PATH <br />BIKESIDEWALK <br />SIDEWALK SIDEWALKPARKINGPARKING <br />PARKING PARKINGLANELANEPROPOSED <br />EXISTING <br />12’12’ <br />LANE LANE <br />CL <br />CL <br />SECTION H: 27th Ave SE, North of Como Ave SE (60’ Existing ROW) <br />SCALE: 1/8”=1’ <br />0 8’6’2’4’ <br />6’ <br />6’6’ <br />4’ <br />6’6’ <br />4’5’5’ <br />8’8’ <br />8’8’10’10’ <br />BOULE- <br />VARD <br />BOULE- <br />VARD <br />BOULE- <br />VARD <br />PEDBIKE <br />TRAIL: SEPARATE USE PATH <br />BIKESIDEWALK <br />SIDEWALK SIDEWALKPARKINGPARKING <br />PARKING PARKINGLANELANEPROPOSED <br />EXISTING <br />12’12’ <br />LANE LANE <br />CL <br />CL <br />SECTION H: 27TH AVE SE, NORTH OF COMO AVE SE (60’ EXISTING ROW) <br />PROPOSED <br />EXISTING <br />27TH AVE SE <br />Another alternate route takes trail users from the railyard <br />crossing at 25th Avenue SE up to 24th Avenue SE north of the <br />tracks and then over to 27th Avenue SE. This route takes trail <br />users up the median of 27th/28th Avenue SE south of Como <br />Avenue, and then stays on the west side of the street on a <br />shared use trail (Section G and Section H.) This concept does <br />not remove parking from the street. <br />Crossing of the tracks for both alternate route concepts would <br />require additional study to ensure the safety of all modes. If <br />an at grade crossing is pursued, the most direct crossing is at <br />Paul Place which maximizes keeping the trail on the existing <br />street grid, but require an easement or acquisition of a parcel <br />[See GRML Easements & Acquistions, Figure 26 and 27]. <br />SECTION KEY <br />H <br />33RD AVE SESE HENNEPIN AVE <br />27TH AVE SE29TH AVE SE272
The URL can be used to link to this page
Your browser does not support the video tag.