My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION PACKET 01292019
StAnthony
>
City Council
>
City Council Work Session
>
2019
>
CC WORKSESSION PACKET 01292019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2019 2:49:37 PM
Creation date
1/23/2019 2:48:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION <br />EAST OF THE RIVER PARK MASTER PLAN <br />OPERATIONS AND <br />MAINTENANCE <br />FIGURE 29 |PREFERRED AND ALTERNATIVE <br />GRML ROUTES <br />A <br />B <br />E <br />E <br />G <br />H I <br />J <br />K <br />L <br />C <br />D <br />Hennepin <br />Uni <br />v <br />e <br />r <br />s <br />i <br />t <br />y <br />35-W <br />Como IndustrialS <br />t <br />. <br /> An <br />th <br />on <br />y <br /> P <br />a <br />r <br />kw <br />a <br />y <br />F <br />INTERSECTION CONSIDERATIONS ALONG THE <br />ROUTE SEGMENT: <br />The proposed routes continue along East Hennepin Ave to the <br />intersection of Industrial Boulevard NE and East Hennepin <br />Avenue. MPRB would like to explore alternatives for a shared <br />use trail along the southern edge of East Hennepin Avenue for <br />this segment coming from the east or the west, depending on <br />the southern route. Trail users will move along Hennepin to <br />Industrial Boulevard for a safe, signalized crossing. This option <br />would not entail adding a signal on Hennepin, and could <br />therefore maintain its level of service. A potential for rail spur <br />connection from 33rd Avenue will be explored that would <br />allow the trail to bypass busy Hennepin, but still make use of <br />the signalized crossing at Industrial Boulevard and Hennepin <br />Avenue. <br />SAINT ANTHONY PARKWAY: <br />In the preferred and alternate route concepts, the GRML <br />moves from Industrial Boulevard across 35W to Saint Anthony <br />Parkway. In 2018, a shared use trail was installed on the <br />west side of Industrial Boulevard connecting across 35W to <br />Ridgway Parkway. The GRML proposed routes call for the <br />shared use path to continue up the west side of the parkway <br />north of 35W until the driveway to Gross Golf Course where <br />trail users will cross over the parkway to the east side of the <br />street to continue on a regional trail that will take them north <br />(Section L). The intersection at Saint Anthony Parkway and <br />New Brighton should be improved to accommodate for safer <br />bike and pedestrian crossings. Diagram M shows the crossing <br />suggestions. North of Saint Anthony’s Trillium Park, the trail <br />will move to an on-street bike lane configuration with the <br />potential for an off street facility in the future. <br /> <br />MAP LEGEND <br />Alternative Route 1: Elevated Crossing <br />Preferred Route: Elevated Crossing <br />Alternative Route 2: Elevated Crossing <br />ALTERNATIVE ROUTESPREFERRED ROUTE <br />EXISTING OTHER <br />Railroad Crossing <br />Sub-Option <br />ALTERNATE ROUTE 2: <br />Bike + Pedestrian + Automobile Access <br />Bike + Pedestrian + Automobile Access <br />Bike + Pedestrian Access Only <br />Bike + Pedestrian + Automobile Access <br />Existing Grand Rounds Route <br />Existing Bike Route (Other) <br />MPRB Property <br />Green Line LRT and Stations <br />Bike + Pedestrian Access Only <br />On Street Route Segment <br />Granary Corridor <br />Section Guide <br />INTERSECTION CONSIDERATIONS ALONG THE <br />ROUTE SEGMENT: <br />The trail will continue on the north side of St. Anthony <br />Boulevard and New Brighton Boulevard and switch from <br />off-street to on-street at the intersection of St. Anthony <br />Boulevard and Kenzie Terrace with the addition of a 2-Stage <br />Bike Box, and continue on-street. If needed, there is the <br />opportunity to reduce lane widths to accomodate a trail, <br />especially if needed east of New Brighton. Also recommended <br />is the removal of free right turns and tighten radii, although <br />there could exist right turn lanes that T into the intersection if <br />traffic volumes warrent them. <br />INDUSTRIAL BOULEVARD: <br />In both the preferred concept and the alternate route <br />concepts, the GRML is proposed along Industrial Boulevard <br />starting at Hennepin Avenue (Section J and Section K.) In <br />this concept, a shared use trail would connect users from <br />Como Avenue across I-35W on the west side of the street. To <br />maximize the parkway character and safety on the corridor, <br />boulevard trees, parkway lighting, sidewalks, and, in some <br />cases, reduced traffic lanes are all included in the plan. <br />Gross GolfCourse <br />Parkway to the River <br />M <br />273
The URL can be used to link to this page
Your browser does not support the video tag.