Laserfiche WebLink
PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION <br />EAST OF THE RIVER PARK MASTER PLAN <br />OPERATIONS AND <br />MAINTENANCE <br />SECTION L: Industrial Blvd NE and N of Broadway St NE (100’ ROW) <br />SCALE: 1/8”=1’ <br />0 8’6’2’4’ <br />6’3’12’ <br />BOULE- <br />VARDBOULEVARDBOULEVARD <br />MEDIAN <br />SIDEWALKTRAILPROPOSED <br />EXISTING <br />12’ <br />12’12’ <br />11’ <br />12’ <br />12’20’ <br />6’ <br />14’ <br />14’14’ <br />LANE <br />LANE LANE <br />TURN LANE <br />TURN LANE <br />LANE <br />LANE LANE <br />SECTION L: Industrial Blvd NE and N of Broadway St NE (100’ ROW) <br />SCALE: 1/8”=1’ <br />0 8’6’2’4’ <br />6’3’12’ <br />BOULE- <br />VARDBOULEVARDBOULEVARD <br />MEDIAN <br />SIDEWALKTRAILPROPOSED <br />EXISTING <br />12’ <br />12’12’ <br />11’ <br />12’ <br />12’20’ <br />6’ <br />14’ <br />14’14’ <br />LANE <br />LANE LANE <br />TURN LANE <br />TURN LANE <br />LANE <br />LANE LANE <br />SECTION K: INDUSTRIAL BLVD NE AND N OF BROADWAY ST NE (100’ ROW) <br />PROPOSED <br />EXISTING <br />SECTION KEY <br />K <br />INDUSTRIAL BLVD NEBROADWAY ST NE <br />275